Summary
Ali Jeddi is a Supplier Quality Engineer and SQS professional with 25+ years of experience across power generation, oil & gas and industrial projects, including 12+ years in supplier quality surveillance, vendor inspection, expediting and manufacturing oversight across Europe. He has completed 300+ vendor inspections and executed more than 1,000 inspection notifications covering mechanical systems, welded fabrications, pressure equipment, piping, turbomachinery auxiliary systems, skids and fabricated assemblies. His expertise spans welding, NDT, dimensional inspection, pressure testing, material traceability, FAT, manufacturing progress control, inspection dossiers, NCR/CAPA management and supplier performance monitoring. He has supported major clients including Siemens Energy, Baker Hughes, ADNOC, Qatar Energy LNG, McDermott and Air Liquide, acting as an interface between EPC contractors, OEMs, suppliers and inspection agencies. He also managed engineering execution for a 500 MW Combined Cycle Power Plant EPC project.
summary may omit high-priority source evidence: Completed 300+ vendor inspections and executed 1,000+ inspection notifications across European manufacturing facilities.
Qualifications and Training
- PMP® – Project Management Institute (PMI), USA
| SQS Certifications (FLUOR University): Pumps | Compressors | Electrical | Valves | Instrumentation | Reporting |
|---|
- NDT Certifications: UT & RT (valid until 2028)
Codes & Standards
- API 610
- API 618
- API 614
- API 671
- ASME Section VIII
- Section IX
- B31.3
- B16.5
- ISO 3834
- ISO 15614
- ISO 9606
- ISO 5817
- AWS D1.1 (structural welding – familiar)
- EN 1090-2 (execution of steel structures – familiar)
- PED (Pressure Equipment Directive)
- ISO 12944
- ISO 8501
- ISO 8502
- SSPC
- IEC 60034
- IEC 62271
- IEC 60076
- IEC 61439
- ISO 9001 (QMS)
- EN 10204
- ASTM
Work Experience
2015 – Present
Environmental Star s.r.o.
Supplier Quality Engineer
- Performed supplier quality surveillance and vendor inspection across Europe.
- Executed inspection, expediting and supplier coordination activities.
- Monitored fabrication, testing and delivery processes.
- Managed NCRs, corrective actions and inspection reporting.
- Supported supplier performance monitoring and risk identification.
2000 – 2014
FARAB Co.
Engineering Project Manager
- Managed engineering execution of a 500 MW Combined Cycle Power Plant (EPC).
- Coordinated with MAPNA, using Siemens-licensed technology, as power block supplier.
- Ensured compliance with technical and quality requirements.
- Managed supplier coordination and project interfaces.
Projects
Client: Suncor Energy
Suncor Energy U2 Coke Drum Integrity Project (Canada)
Vendor: voestalpine GmbH Linz (Austria)
Product: Alloy 625 Hot Rolled Clad Plates
Standards: ASME SA-204, ASME SA-265 and EN 10204 Type 3.2
- Performed dimensional inspection and flatness verification.
- Verified cladding thickness measurements.
- Inspected material traceability and marking.
- Performed visual inspection and packaging verification.
- Reviewed automated ultrasonic testing (UT) results.
- Verified final acceptance and release documentation.
- Verified compliance with the project ITP and customer specifications.
Client: LOWER ZAKUM LTDP-1 EPC WORKS FOR EPS-2 AND PDP PROJECT
LOWER ZAKUM LTDP-1 EPC WORKS FOR EPS-2 AND PDP PROJECT
Vendor: SCHOELLER BLECKMANN Edelstahlrohr GmbH Rohrstrasse 1, A-2630 Ternitz -Austria
Product: SA213 TP316L tubes
Standards: ASME SA213 TP316L; approved PMI procedure PMI-SQ250526_rev1
- Witnessed PMI testing in accordance with the approved ITP and PMI procedure.
- Verified compliance with ASME SA213 TP316L.
- Verified conformance with approved PMI procedure PMI-SQ250526_rev1.
- Verified heat number traceability.
- Verified surface preparation and PMI methodology.
- Verified instrument calibration and daily verification.
- Verified operator qualification.
LMF
Vendor: LMF (Austria)
Product: API 618 Reciprocating Compressor Packages and auxiliary systems
Standards: API 618
- Performed supplier quality surveillance and expediting of API 618 Reciprocating Compressor Packages and auxiliary systems.
- Monitored manufacturing progress and coordinated inspections.
- Verified performance testing.
- Reviewed quality documentation.
- Followed up NCRs and monitored delivery.
Client: Daleel Petroleum
Daleel Petroleum E2101 Water Treatment Facilities Upgrade
Vendor: KAESER Kompressoren (Austria)
Product: Instrument Air Compressor & Air Dryer Package
- Performed FAT and final inspection of the Instrument Air Compressor & Air Dryer Package.
- Witnessed compressor performance testing.
- Verified vibration and noise measurements.
- Tested the master control panel.
- Performed instrumentation functional testing.
- Verified alarms and trips.
- Tested control logic.
- Verified loop checks and sequence operation.
- Recommended final release and shipment.
Client: MBNS
MBNS
Product: Waste heat recovery system components, fabricated structures, ducting and piping
Location: Czech Republic
- Performed supplier quality surveillance of waste heat recovery system components.
- Covered welding inspection, NDT, coating and documentation review.
- Managed NCRs and provided expediting support.
Client: Siemens Energy / ADNOC
Siemens Energy / ADNOC Upper Zakum Projects
Vendor: Regal Beloit (Slovakia)
Product: API 671 High-Speed Compressor Couplings
Standards: API 671
Position: Resident Supplier Quality Inspector & Expeditor
- Performed PMI, dimensional inspection, UT, MT, PT, balancing verification and assembly inspection.
- Witnessed dynamic balancing tests and final inspection before shipment.
- Verified compliance with API 671 and project specifications.
- Prepared inspection reports and identified NCRs.
- Followed up corrective actions.
- Supported expediting and monitored manufacturing progress.
- Executed 110+ inspections over two years as a long-term on-site quality representative.
- Supported LNG and compressor projects for major energy clients.
Client: KSM Methanol Plant
KSM Methanol Plant
Vendor: APOLLO Gößnitz (Germany)
Product: API 610 Centrifugal Pumps
Standards: API 610
- Performed FAT of API 610 Centrifugal Pumps.
- Witnessed pump performance testing and NPSH verification.
- Verified vibration measurement and analysis.
- Monitored bearing temperatures and noise testing.
- Witnessed mechanical running tests.
- Reviewed hydrostatic pressure test results.
- Evaluated pump performance against contractual acceptance criteria.
Client: IT SAFCO
IT SAFCO
Product: Centrifugal pumps
Standards: ISO 9906 Grade 2B
Location: Austria
- Performed FAT and performance testing of centrifugal pumps.
- Verified head-capacity curves, efficiency and duty points.
- Reviewed power consumption.
- Verified PMI and hydrotest results.
- Verified test documentation.
Client: Bid Boland Gas Treating Project
Bid Boland Gas Treating Project
Vendor: MSA (Czech Republic)
Product: 20” Class 900 and 42” Class 600 Emergency Shutdown Ball Valves (ESDV)
Standards: API 6D / API 598
- Performed inspection and FAT of Emergency Shutdown Ball Valves.
- Performed dimensional inspection and marking verification.
- Witnessed hydrostatic shell tests and seat leakage tests.
- Performed functional testing using hydraulic actuators.
- Verified open/close timing and fail-safe operation.
- Performed PMI and traceability verification.
- Reviewed valve test certificates and manufacturing records.
Client: Air Liquide
Air Liquide Midwest HGZP Project
Vendor: Flowserve (Villach, Austria)
Product: Control valves and on-off valves
Standards: ASME B16.34 and IEC 60534; ANSI/FCI 70-2
- Performed FAT of control valves and on-off valves.
- Performed functional stroke testing and actuator performance verification.
- Performed control valve calibration and positioner tuning.
- Witnessed seat leakage testing.
- Performed pneumatic fail-safe testing.
- Reviewed diagnostic stroking-time analysis.
- Verified I/P converters and smart positioners.
- Reviewed PMI and documentation.
BHDT GmbH
Vendor: BHDT GmbH (Austria)
Product: High-pressure control valves
- Performed inspection and FAT of high-pressure control valves for severe-service hydrogen and high-pressure gas systems.
- Witnessed high-pressure body and seat leakage testing.
- Performed functional testing under simulated operating conditions.
- Performed PMI and material verification.
- Inspected forged and high-alloy pressure-retaining components.
- Reviewed the manufacturing dossier and compliance documentation.
Client: KSM Methanol Project
KSM Methanol Project
Vendor: SCHIEBEL (Austria)
Product: Electric Actuators (MOV Systems)
- Performed FAT and supplier quality inspection of Electric Actuators (MOV Systems).
- Verified torque settings and torque shut-off.
- Verified limit switch settings.
- Performed functional testing and travel verification.
- Verified IP67 protection and electrical parameters.
- Reviewed documentation and followed up NCRs.
Client: ADNOC Umm Shaif Phase 1 & LNG Hub Projects
ADNOC Umm Shaif Phase 1 & LNG Hub Projects
Vendor: Innomotics (Czech Republic)
Product: High-Voltage Electric Motors up to 11 kV / 2.85 MW
Standards: IEC 60034
- Executed PIM, FAT and expediting of high-voltage electric motors.
- Performed insulation resistance and polarization index testing.
- Witnessed winding resistance, locked rotor, dielectric withstand, partial discharge and tan delta testing.
- Verified no-load and vibration measurements.
- Verified terminal box, cooling system and nameplate data.
- Monitored manufacturing progress and followed up FAT readiness.
Client: SINOPEC SABIC Polycarbonate Project
SINOPEC SABIC Polycarbonate Project
Vendor: Siemens AG (Germany)
Product: Compressor-driver motor rotors
Standards: IEC 60034-14 and ISO 21940
- Witnessed compressor-driver motor rotor balancing activities.
- Verified rotor balancing.
- Verified compliance with IEC 60034-14 and ISO 21940.
- Reviewed balancing records and manufacturing quality documentation.
Client: KSM Deflaring Project
KSM Deflaring Project
Vendor: ABB (Brno, Czech Republic)
Product: ABB UniGear ZS1 Medium Voltage Switchgear (12 kV) AIS
Standards: IEC 62271
- Executed PIM, FAT and expediting of ABB UniGear ZS1 Medium Voltage Switchgear.
- Performed functional and interlock checks.
- Witnessed protection relay testing and CT polarity verification.
- Witnessed HV withstand and insulation tests.
- Verified busbar systems and documentation.
- Followed up manufacturing progress and FAT coordination.
Client: COBRA Project
COBRA Project
Vendor: ABB (Brno, Czech Republic)
Product: ABB UniGear ZS1 Medium Voltage Switchgear (12 kV) AIS
Standards: IEC 62271
Position: Expediting & FAT
- Executed PIM, FAT and expediting of ABB UniGear ZS1 Medium Voltage Switchgear.
- Performed functional and interlock checks.
- Witnessed protection relay testing and CT polarity verification.
- Witnessed HV withstand and insulation tests.
- Verified busbar systems and documentation.
- Followed up manufacturing progress and FAT coordination.
Client: KSM 500 MW Combined Cycle Power Plant
KSM 500 MW Combined Cycle Power Plant
Vendor: EGE (Czech Republic)
Product: Isolated Phase Bus Duct (IPB) systems
Standards: IEC 60071 and ANSI C37.23
- Performed FAT and inspection of Isolated Phase Bus Duct systems.
- Witnessed insulation resistance and busbar resistance measurements.
- Witnessed 60 kV power-frequency withstand testing.
- Verified compliance with IEC 60071 and ANSI C37.23.
- Performed dimensional and coating inspection.
Client: TotalEnergies
TotalEnergies AR Ratawi Gas Processing Project
Vendor: Baker Hughes (Hungary)
Product: Unit Control Panels (UCP), HMI and Remote I/O Systems
Standards: IEC 61131
- Executed PIM, FAT and expediting of UCP, HMI and Remote I/O Systems.
- Performed functional logic verification and signal simulation.
- Performed I/O checks and loop verification.
- Witnessed Modbus, Profibus and Ethernet communication testing.
- Verified the Cause & Effect Matrix.
- Witnessed alarm and trip testing.
- Reviewed software and configuration.
- Monitored manufacturing progress.
Client: BP
BP Ubadari Carbon Capture Project
Vendor: Baker Hughes (Hungary)
Product: Generator Control & Protection Panels (GCPP)
- Performed FAT of Generator Control & Protection Panels.
- Verified generator synchronization logic.
- Witnessed protection relay and lockout relay testing.
- Validated the tripping matrix.
- Witnessed alarm, trip and control logic testing.
Yokogawa
Vendor: Yokogawa (Vienna, Austria)
Product: DCS and ESD Systems
Standards: IEC 61511
- Performed FAT of DCS and ESD Systems in accordance with IEC 61511.
HORIBA
Vendor: HORIBA (Tulln, Austria)
Product: Process gas analyzers and emission monitoring systems (CEMS)
- Performed inspection and FAT of process gas analyzers and emission monitoring systems (CEMS).
EMKOMETER
Vendor: EMKOMETER (Czech Republic)
Product: Flow measurement instruments
Standards: ISO 5167 and IEC requirements
- Performed calibration and FAT of flow measurement instruments.
Client: Nutrien Canada
Nutrien Canada Boiler Feed Water Exchanger Project
Vendor: Casale SA / SBN (Austria)
Product: ASME Shell-and-Tube Heat Exchanger
- Performed manufacturing surveillance of an ASME Shell-and-Tube Heat Exchanger.
- Witnessed VT, MT, UT, TOFD and PAUT.
- Witnessed PWHT and hardness testing.
- Inspected pressure boundary welds.
- Reviewed material certifications.
- Performed supplier quality follow-up.
Client: KSM Project
KSM Project
Vendor: Moravia Apex (Czech Republic)
Product: Steam Air Preheaters and Cold Air Preheaters
Standards: ASME
- Performed inspection and manufacturing surveillance of Steam Air Preheaters and Cold Air Preheaters.
- Witnessed hydrostatic and leakage testing.
- Performed dimensional and coating inspection.
- Verified completeness and ASME compliance.
Client: Al Dhafra OCGT IPP & HAMMERHEAD Projects
Al Dhafra OCGT IPP & HAMMERHEAD Projects
Vendor: John Crane (Czech Republic)
Product: Seal Gas Scrubbers and Fuel/Seal Gas Filter Systems
Standards: ASME VIII; EN 10204
- Performed inspection and FAT of Seal Gas Scrubbers and Fuel/Seal Gas Filter Systems.
- Witnessed hydrostatic testing.
- Reviewed PMI and NDT documentation.
- Verified ASME VIII pressure equipment compliance.
- Reviewed EN 10204 traceability.
Client: Suncor
Suncor U2 Coke Drum Integrity Project (Canada)
Vendor: Voestalpine Grobblech (Austria)
Product: Alloy 625 Clad Plates
Standards: ASME SA-265, ASME SA-204 and EN 10204
- Performed final inspection of Alloy 625 Clad Plates.
- Performed dimensional verification and cladding thickness measurements.
- Reviewed UT reports.
- Verified material traceability.
- Performed packaging inspection.
- Verified compliance with ASME SA-265, ASME SA-204 and EN 10204.
Client: KSM Methanol Project
KSM Methanol Project
Vendor: Liberty Ostrava (Czech Republic)
Product: API 5L Seamless Pipes
Standards: API 5L; EN 10204 Type 3.2
- Performed inspection of API 5L Seamless Pipes.
- Witnessed chemical analysis, tensile and hydrostatic testing.
- Reviewed EN 10204 Type 3.2 certification.
- Verified traceability.
- Performed shipment release inspection.
Client: KSM Project
KSM Project
Vendor: TENARIS SILCOTUB (Romania)
Product: API 5L PSL1 / ASTM A106 Seamless Line Pipes
Standards: API 5L PSL1 / ASTM A106; NACE
- Performed manufacturing surveillance and final inspection of seamless line pipes.
- Witnessed hydrostatic testing up to 340 bar and EMI examination.
- Reviewed mechanical testing and chemical analysis.
- Performed NACE compliance assessment.
- Verified traceability and marking.
Client: AL-BABTAIN Power & Telecommunication Project (Egypt)
AL-BABTAIN Power & Telecommunication Project (Egypt)
Vendor: Železiarne Podbrezová (Slovakia)
Product: Seamless pressure tubes
Standards: PED
- Performed inspection of seamless pressure tubes.
- Witnessed tensile, flattening, drift expansion and chemical analysis testing.
- Verified 100% Eddy Current NDT.
- Reviewed PED compliance.
Client: ADNOC Qusahwira Field Development Phase II
ADNOC Qusahwira Field Development Phase II
Vendor: Mosdorfer (Austria)
Product: 33 kV Transmission Line Hardware
Standards: IEC 61284
- Performed FAT and final inspection of 33 kV Transmission Line Hardware.
- Witnessed mechanical load and tensile testing.
- Verified IEC 61284 compliance.
- Performed hot-dip galvanizing inspection.
- Verified assembly and supported manufacturing release activities.
Skills
- Supplier Quality Engineering
- Supplier Quality Surveillance
- Vendor Inspection
- Expediting
- Manufacturing Surveillance
- Mechanical Inspection
- Welding Inspection
- NDT Inspection
- Electrical & Instrumentation Inspection
- FAT Execution
- NCR Management and CAPA
- Supplier Performance Monitoring
- Quality Documentation Control
- Inspection Reporting
- Root Cause Analysis
Commodities
- Compressor Packages
- Pump Packages
- Pressure Equipment
- Pressure Vessels
- Heat Exchangers
- Filters
- Piping Systems
- Skids
- Welded Fabrications
- Structural Assemblies
- Compressors
- Pumps
- Couplings
- Industrial Valves
- MOV Systems
- Electric Motors
- Switchgear
- Transformers
- Control Panels
- DCS and ESD Systems
- Process Gas Analyzers
- Flow Measurement Instruments
- Transmission Line Hardware
- Steel and Clad Plates
- Seamless Pipes and Tubes