Xu Wei is an inspection professional with extensive experience in electrical and instrumentation inspection, expediting, auditing, welding, NDT, coating, OHSE, and pre-shipment activities. He has performed third-party manufacturing inspections for international power, renewable energy, oil and gas, petrochemical, and industrial projects involving major owners and operators. His scope includes quality-document review, production-process and schedule monitoring, in-process and final inspection, packing and delivery inspection, and comprehensive Factory Acceptance Test witnessing. He has inspected transformers, generators, switchgear, motors, compressors, power conversion systems, DCS, CEMS, rectifiers, and other electrical equipment, including detailed electrical, mechanical, functional, insulation, withstand-voltage, vibration, noise, and performance testing. Xu Wei also manages punch-list and quality-problem closure through release documentation.
summary: removed unverifiable '18 years' experience claim
summary may omit high-priority source evidence: 18 years of experience stated, with a Junior college education from Nanjing Technical College in Mechanotronics mechanical-electrical integration.
Education
- Junior college — Nanjing Technical College; Major Mechanotronics mechanical-electrical integration
- Diploma
Work Experience
May 2023 – Mar 2026
TPI AGENCY
- Performed third-party manufacturing inspection, quality-document review, production-process monitoring, schedule control, and in-process and final product inspection across electrical, instrumentation, power, renewable energy, oil and gas, petrochemical, and industrial projects.
- Witnessed Factory Acceptance Tests for transformers, generators, switchgear, motors, compressors, power conversion systems, DCS, CEMS, rectifiers, and related equipment, including electrical, mechanical, functional, insulation, withstand-voltage, vibration, noise, and performance testing.
- Issued, released, closed, and tracked punch-list items, NCRs, and quality problems through to closure, and inspected packing and delivery.
Projects
DEC 2025 – MAR 2026
Client: Irkutsk Oil Company
Irkutsk Oil Bitcoin Project
Vendor: Guangxi Yuchai Machinery Co., Ltd.
Product: Containerized Power Module
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
SEP 2025 – NOV 2025
Client: Kuwait Energy Basra Limited (KEBL)
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR B9 POWER PLANT (PHASE 1)
Vendor: SUMEC MACHINERY&ELECTRIC CO.,LTD
Product: Diesel generator 5 sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including no-load, protection function, diesel generator functional, synchronization and control-panel functional, load, noise, temperature-rise, and generator-set vibration tests.
- Inspected packing and delivery.
AUG 2025
Client: Stegra
Boden Green Steel Plant Project
Vendor: Hubei Green Power Co., Ltd.
Product: POWER THYRISTOR RECTIFIER 4sets. CONTROL CABINET 4sets. POLARIZATION RECTIFIER 8sets. BOOSTER RECTIFIER 8sets. DC ISOLATORS 16sets. COOLING WATER SKID 4sets. LV Power Distribution Panel (LVPD) 4sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
JUN 2025 – JUL 2025
Client: Amur Gas Chemical Complex (AGCC)
PE/PP/LAO UNITS Project
Vendor: Supcon Technology Co., Ltd.
Product: PLC cabinet 38sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
MAY 2025 – JUN 2025
Client: Amur Gas Chemical Complex (AGCC)
PE/PP/LAO UNITS Project
Vendor: Jiangsu Yawei Transformer Co., Ltd.
Product: Dry type distribution transformers 14sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including voltage ratio and phase displacement, winding resistance, insulation resistance, insulation checks, dissipation factor and capacitance, no-load loss and current, short-circuit impedance and load loss, sound-level, impulse, withstand-voltage, partial-discharge, temperature-rise, auxiliary wiring and control, and other transformer tests.
- Inspected packing and delivery.
APR 2025 – MAY 2025
Client: ABU DHABI NATIONAL OIL COMPANY (ADNOC)
HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 1–OFFSHORE FACILITIES
Vendor: Siemens Energy Transformer (Wuhan) CO., Ltd.
Product: 33kV 40MVA Transformer 2 sets, 33kV 60MVA Transformer 1 set, 33kV 25MVA Transformer 2 set.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, transferred-surge, wiring, control, fan, and oil-pump tests.
- Inspected packing and delivery.
MAR 2025 – APR 2025
Client: SEMBCORP COGEN PTE LTD.
Banyan CCP4 project
Vendor: Siemens Energy Transformer (Wuhan) CO., Ltd.
Product: 230kV 69MVA Station service transformer 1 set, 22.5kV 36MVA Unit auxiliary transformer 1 set, 22kV 36MVA Unit auxiliary transformer 1 set.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, transferred-surge, wiring, control, fan, and oil-pump tests.
- Inspected packing and delivery.
FEB 2025 – MAR 2025
Client: Saudi Electricity Company
Supply and Installation of HV Mobile Substations project
Vendor: Zhejiang jiangshan transformer co., Ltd.
Product: 33(13.8)kV 150kVA Auxiliary transformer 20 sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, transferred-surge, wiring, control, fan, and oil-pump tests.
- Inspected packing and delivery.
FEB 2025
Client: China Energy Co., Ltd.
Dzhankeldy 500MW Wind Power Project
Vendor: Yixing Huayong Motor Co., Ltd.
Product: HV motor
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
JAN 2025
Client: Sungrow
SP0116 - Grootfontein PV1 EPC
Vendor: Siemens Medium Voltage Switching Technologies (Wuxi) Ltd.
Product: RMU
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
DEC 2024
Client: BASF Integrated Site (Guangdong) Co. Ltd.
BASF (Guangdong) Integrated Project
Vendor: Hangzhou Wood Control Technology Co., Ltd.
Product: GAS compressor 25 sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including pressure, flow, sealing, electrical safety, explosion-proof and environmental-safety, mechanical running, motor performance, vibration and noise, and durability tests.
- Inspected packing and delivery.
OCT 2024 – NOV 2024
Client: Obelisk
Obelisk
Vendor: Cummins Power Generation (China) Co., Ltd
Product: Diesel generator
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
SEP 2024 – DEC 2024
Client: Neimenggu Shangdu Mengneng New Energy Co., Ltd
Shangdu 1500 MVA photovoltaic grass industry project
Vendor: Henan Senyuan Electrical Co., Ltd.
Product: Box-type transformer YBH-40.5/0.8(XG)/T-3300 469 sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, and transferred-surge tests.
- Inspected packing and delivery.
AUG 2024
Client: Neimenggu Shangdu Mengneng New Energy Co., Ltd.
Shangdu 1500 MVA photovoltaic grass industry project
Vendor: Shandong Taikai Transformer Co., Ltd.
Product: Transformer SFZ20-300000/220 2 sets.
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, and transferred-surge tests.
- Inspected packing and delivery.
JUL 2024
Client: UGL Engineering Pty Limited
Collie BESS 2
Vendor: SUMEC Machinery & Electric Co., Ltd.
Product: Diesel generator
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
JUN 2024
Client: UGL Engineering Pty Limited
BESS 2 Project
Vendor: Sungrow
Product: PCS
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
MAY 2024
Client: JGPL-RVNL EPC PRIVATE LIMITED and MASDAR
Bukhara BESS Project
Vendor: Sungrow
Product: PCS SKID
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
- Inspected packing and delivery.
APR 2024
Client: AMUNET WIND POWER COMPANY S.A.E.(AWPC)
Amunet 500MW Wind Power Project
Vendor: Anhui Huajin Cable Group Co. Ltd.
Product: SS MV Cable
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
FEB 2024 – MAR 2024
DEC Bukhara UZ 82.5MW/150.45 MWh ESS Project
Vendor: Cummins Power Generation (China) Co., Ltd
Product: Diesel generator
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
JAN 2024
Client: arsen & Toubro Saudi Arabia LLC
PIF3 Ar Rass2 Project
Vendor: JIANGSU DAQO CHANGJIANG ELECTRIC CO. LTD.
Product: RMU cabinet
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
OCT 2023 – DEC 2023
Client: BASF Integrated Site (Guangdong) Co. Ltd.
BASF (Guangdong) Integrated Project
Vendor: Jiamusi Motor CO., Ltd.
Product: Motor
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued and released punch-list items and tracked them through to closure.
AUG 2023 – SEP 2023
Client: ENEL Italy
ENEL Green Power BESS
Vendor: Jiangsu Huapeng Transformer Co., Ltd. (JSHP)
Product: Transformer SFFZ10-250000/220
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, and transferred-surge tests.
- Inspected packing and delivery.
JUL 2023 – AUG 2023
Client: Global Power Generation
SUPPLY OF MV / HV Transformer FAMILIA 1.2 Balbona
Vendor: Jiangsu Huapeng Transformer Co., Ltd. (JSHP)
Product: Transformer SFZ10-130000/132
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT), including transformer electrical, insulation, impulse, withstand-voltage, partial-discharge, temperature-rise, OLTC, insulating-oil, SFRA, vacuum, oil-leakage, pressure/deflection, and transferred-surge tests.
- Inspected packing and delivery.
MAY 2023 – JUN 2023
Uzbekistan Dzhankeldy 500MW Wind Power 500MW wind power project
Vendor: Beijing State Guodian CLP Energy Conservation and Environmental Protection Technology Co., LTD.
Product: CEMS 10sets
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Witnessed the Factory Acceptance Test (FAT), including review of quality certificates and raw-material and component test reports, visual and marking inspection, cabinet inspection, air-tightness inspection, probe heating-temperature test, powered-on analyzer test, DAHS system test, document and spare-parts review, and shipping preparation check.
APR 2023 – MAY 2023
Client: Enel Green Power S.p.A.
Ecological Reconstruction of The Thermal Power Plant "Pljevlja" - Unit I
Vendor: Siemens Energy Automation (Nanjing) Co., Ltd.
Product: DCS,18sets
- Reviewed quality documentation and monitored the production process.
- Conducted in-process and final product manufacturing inspection.
- Controlled and monitored the production schedule.
- Witnessed the Factory Acceptance Test (FAT).
- Issued, closed and tracked quality problems.
- Inspected packing and delivery.
MAR 2023 – APR 2023
Client: Enel Green Power S.p.A.
Ecological Reconstruction of The Thermal Power Plant "Pljevlja" - Unit I
Vendor: NANJING DAQO ELECTRIC CO.,LTD.
Product: LV switch cabinet 54 sets
- Conducted component incoming inspection.
- Conducted general assembly inspection.
- Witnessed the Factory Acceptance Test (FAT), including cabinet, installation and wire-connection, insulation-resistance, protective-circuit, power-frequency withstand-voltage, auxiliary-circuit withstand-voltage, control-device functional, mechanical operation, mechanical and electrical interlock, and interchangeability tests.
JUN 2023
EPCC of CPF-OIL Treatment System and Auxiliary Systems
Vendor: Eaton Electric Equipment Co. , Ltd.
Product: LV Switchgears,23sets
- Performed document review, visual inspection, dimensional check, protective-circuit check, dielectric withstand-voltage test, wiring and label check, and packing and delivery inspection.
OCT 2022
AL DAFRA PV2 SOLAR POWER STATION PROJECT
Vendor: Xiamen ABB HV switchgear Co.,Ltd.
Product: LV Switchgears,10sets
- Performed document review, visual inspection, dimensional check, protective-circuit check, dielectric withstand-voltage test, wiring and label check, and packing and delivery inspection.
SEP 2022
Client: Enel Green Power S.p.A.
Bugala One Solar Farm
Vendor: Siemens Medium Voltage Switching Technologies (Wuxi) Ltd.
Product: LV Switchgear 15sets
- Reviewed quality control documents.
- Witnessed the FAT.
- Performed final and packing inspection.
- Closed NCRs and issued release notes.
SEP 2022
1263MW Punjab Power Plant,Jhang,Pakistan
Vendor: Schneider Electric (Xiamen)Switchgear Equipment Co., Ltd.
Product: LV Switchgears 21sets
- Conducted raw-material incoming inspection.
- Reviewed quality documentation.
- Controlled quality during product production.
- Witnessed sampling and factory tests.
- Performed final visual and dimensional inspection.
- Checked packing and marking.
- Reviewed the manufacturing data book and issued the release note.
Languages
- Mandarin — Native Language
- English — Oral Fluent
- English — Written Excellent
Skills
- Auditing
- Expediting
- Welding
- NDT
- Painting/Coating/Insulation
- Electrical Inspection
- OHSE
- Pre-Shipment/Loading
Commodities
- Drilling Equipment
- OCTG/Line Pipe
- Wellhead Equipment
- Bulk Material
- Static Equipment
- Machinery & Units
- Civil & Structural Equipment
- Electrical & Instrumentation Equipment
- Marine Engineering Equipment
- Containerized Power Modules
- Diesel Generators
- Transformers
- Switchgear
- Switch Cabinets
- Motors
- Gas Compressors
- Rectifiers
- Control Cabinets
- Power Conversion Systems
- Cables
- DCS
- CEMS
- LV Switchgears
- Cooling Water Skids