← All extractions  |  Download .docx  |  Compare with desired CV →
Fulkrum — Standardized CV (PoC)

Otto Bouma

Summary

Otto Bouma is an Inspection Engineer with experience since 1995, specialising in electrical and instrumentation inspection, automation and control, electrical power, rotating equipment, and general mechanical equipment. He provides third-party inspection and supplier quality surveillance, electrical maintenance inspections, E&I design review, electrical power engineering, hazardous-area classification consultancy, and electrical power installation services across Oil & Gas, Power, and Renewable Energy projects. His expertise covers equipment used for general and occupational hazard classification in accordance with widely accepted IECEx and ATEX requirements, together with extensive Saudi Aramco and Saudi Electrical Grid inspection approval scope. He has also managed Ex certification services as a Notified Body and brings a professional, practical, independent, and specialist approach to quality assessment.

projects: only 56 table rows extracted but the source's largest table has ~245 rows — possible truncation, review required

Education

Qualifications and Training

Previous Fulkrum Work Experience

YearScope VendorScope TypeMaterial Description
2025Atlas Copco Airpower N.V.InspectionCompressors and blowers
2025Hatenboer-Water BVInspectionReverse Osmosis Potable Water Unit
2025Atlas Copco Airpower N.V.InspectionRLPG Instrument Air Dryers
2025NMI EuroLoopInspectionMetering Skid Fabrication
2024Emerson Automation SolutionsInspectionFlow Transmitter Coriolis
2024Liebherr MCCtec Rostock GmbHInspectionLiebherr RL650 crane
2024NMI EuroLoopInspectionFiscal Metering
2024Allseas Engineering BVInspection• 1x Vega C23 radar sensor 30m • 1x Enclosure (suitcase, Pelican 1510WF Yellow), including o 3 channel data logger (ATR-10-G) o 24V usb charger (Bauer Electronics) • 1x FPT300.242-008-102 (440V to 24V Power supply, Puls), including: o 3 core cable for 24V H07RN-F 3G1.5MM2 o 5 core cable for 440v H07RN-F 5G2.5MM2 o 3 Phase 440V power plug (Stahl 8579/12-507) o 6A inline fuses or 10A circuit breaker
2024ElsyInspectionGas Insulated Switchgear
2024VSLInspectionMetering System - Panel
2024Brassto Coating BVInspectionUltrasonic Flowmeters
2024Krohne AltometerInspectionUltrasonic Flowmeters
2023Boll & Kirch Filterbau GmbHInspectionSeawater Course Filter
2023Krohne AltometerInspectionMetering System - Panel
2023Krohne Oil & Gas B.V.InspectionMetering System - Panel
2023Orga BVInspectionNavigational Aid & Heli Deck Warning Light System
2023Sperre Industri AS (Ellingsoy, Norway)InspectionStarting Air Compressor
2023AC Analytical Controls BVInspectionGCs and Elemental Analysers
2023NMI EuroLoopInspectionULTRASONIC METER
2023Smitsvonk BVInspection: Claymore East: 1 off Ignition Junction Box 1 off Thermocouple Junction Box 4 off HE Ignition Cables (High Temperature)(20m lg) 4 off HE Ignition Cables (Standard Temperature)(150m lg) 1 off Multicore Thermocouple Cable (8 pr)(150m lg) Claymore West: 1 off Ignition Junction Box 1 off Thermocouple Junction Box 4 off HE Ignition Cables (High Temperature)(20m lg) 4 off HE Ignition Cables (Standard Temperature)(150m lg) 1 off
2023Orga BV (Netherlands)InspectionNavigational Aids
2023Boll & Kirch Filterbau GmbHInspectionSeawater Course Filter
2022Drager Nederland B.V.InspectionFire & Gas Detector
2022ABB Oy Motors and GeneratorsInspection129-DREM-0410-A/B– CIP Pump Motors
2022HydacInspectionDGS Skid
2022Airpack BVInspectionNitrogan Generation Package
2021Exheat LtdInspectionHP,MP & LP Gas Compressor Package
2021Orga BV (Netherlands)InspectionNavigation Aid System

Codes & Standards

Work Experience

2009 – Present TPI AGENCY
Owner and Independent technical inspector
⚠ Review: dates overlap with Voltium B.V.; employer replaced on AI judgment alone — verify agency status
2009 – 2020 Voltium B.V.
Owner /MD
⚠ Review: dates overlap with Voltics B.V.
2004 – 2009 KEMA Quality, Arnhem NL
Manager EX certification services
1995 – 2004 TPI AGENCY
Technical Inspector Industrial Services & Manager Industrial Services
1989 – 1995 Carl Schenck, Darmstadt (D)
Sales Engineer power test bench
1986 – 1989 Verolme Elektra BV, Maasluis NL
Project Engineer
⚠ Review: employer contains possible agency name 'BV' — review

Projects

ManufacturerLocationInspected EquipmentClient
ABBCapelle a/d Ijssel (NL)Medium Voltage SwitchpanelJGC
ABBCordoba (S)Power TransformerPDVSA
ABBHanau (G)110 kV SF6 SwitchgearARAMCO
ABBStavanger (N)High Voltage Power Management SystemExxon – FPSO Liza Unity
ABBSkien (N)Low-Voltage Power Distribution boardsExxon – FPSO Liza Unity
ABBVaasa, (Finland)Drive Motoer for Chemical Injection Pumps Skids (incl Ex assement)Veolia
AEGWarstein (D)70 Industrial UPS systemsARAMCO
Alstom GridOberentfelden (Switzerland)Gas Insulated Switchgear GIS 115kVARAMCO
Analytical Solution & ProductsAmsterdam (NL)Advanced Burner Control SystemFluor
Atlas CopcoOosterhout (NL)Air Dryer & CompressorWorley Parsons/Philips Conoco
Atlas CopcoWilrijk (B)Compressor skidAramco
ATB SchorchMönchengladbach (D)2 MW Asynchronous Squirrel Cage Compressor Drive motorHowden Thomassen Compressors
GE-WestinghouseCharlerois (B)8x repair and renovate Nuclear Reactor Circulation Pump MotorANAV (Spain)
GE Grid SolutionsAix-les-Bains (F)SF6 GIS Switchgear – Offshore ApplicationAramco
AUMA RiesterMüllheim (D)Valve ActuatorsARAMCO
Brush HMARidderkerk (NL)5x 30 MW Synchronous GeneratorGE Oil & Gas/Nuovo Pignone
Brush HMARidderkerk (NL)3x 42 MVA Turbo generatorsTotal (E&P)
CEGELECNürnberg (D)Power Control Center for Steam Turbine Generator packageARAMCO
CG Power Systems Belgium (Pouwels)Mechelen (B)2x Power transformersNigerdock
DBR B.V.SliedrechEmergency Diese Generator Package – FPSO Anny NeryYinson
Doedijns Controls B.V.Assen (NL)INS - Metering Package - Gas and OilSingle Buoy Moorings
DrägerHoogvliet, RotterdamGas & Fire detection sensorsSAIPEM
Eaton CorporationHengelo (NL)LV Switchgear and MCC panelsHyunday Engineering and Construction
EmersonEde (NL)Coriolis and Vortex FlowmetersTecnimont
Endress+HauserMaulburg (D)Guided Wave Radar/Automated Tank GaugingAramco
FlowserveEtten-Leur (NL)2 pcs 10 stage double-case barrel pumpsBASF
Focal, MOOGHalifax, Nova Scotia (CANADA)High Voltage Slipring assembly for FPSO Turret Mooring SystemBluewater (Balder Project)
Framo FlatoyFlekhaug/Bergen (Norway)Submersible sea water pumpsSBM Offshore – Liza Unity (Exxon)
HIMA Paul HildebrandtBrühl (D)High Integrity Protective System (HIPS)ARAMCO and others on Several Projects
H.T.T. – KEMA LabArnhemType testing 11.0/3.2 kV 15.5 MVA multi winding step-down transformer for VFDMODEC/FPSO Bacalhau
Industry International B.V.Coevorden (NL)Electrical Substation > Distribution boards / PMS panel / Substation buildingAMEC/Foster Wheeler/Shell Majnoon
KBRGföllner (A)Containerized Medium Voltage Switchgear (Ex package)BP – West Azeri Black Sea
Krohne Oil & GasBredaFiscal Gas Metering SystemTouatgaz/Sonatrach
Krohne Oil & GasBredaMETERING SYSTEMS – CONTROL PANELS and USM for North Field East Project ONSHORE LNG FacilitiesChiyoda/Technip JV
LEWA PumpsLeonberg/Stuttgart (D)Methanol, MEG and Subsea Wax Injection Pump skidsTechnip/BP
MAN Energy SolutionsOberhausen (D)2 trains/skids - LP Gas Compressor/Vapor recovery Unit (Ex- Compex Assessment)(MODEC - FPSO ANITA BARIBALDI (PETROBRAS)
Mokveld ValvesGouda (NL)Control ValvesTechnip
ODS Metering SystemsRidderkerk (NL)Crude oil metering skid with bidirectional proverEngineering for the Petroleum & Process Industries ENPPI//ARAMCO/Yasref
PrysmianDelft (NL)132 kV power cable, termination & auxiliariesZadco
SiemensErfurt (D)2x 150 MW Synchronous Turbo GeneratorsARAMCO
Siemens EnergyMuelheim a/d Ruhr (D)145 kV GIS Switch gear extension baysNational Grid SA/Siemens Energy
SiemensRuhstorf (D)Various Synchronous Motors (Ex-Compex assessment)SBM Offshore – Liza Destiny (Exxon)
SYPACKZoetermeerHelicopter Refueling PackageSBM Offshore – Liza Destiny (Exxon)
YokogawaAmersfoort, NLHIPPS panelsENPPI
VariousVendor Quality Document Review for Expansion and Upgrade Tank Terminal Project HHTTHES – Rotterdam
Scope of ServiceLocationInspected EquipmentClient
Co-generation plant 10 KV incl 10/25 step up transformer – new buildThe Hague Area (NL)Site Acceptance – Commissioning coordinatorAgricultural Enterprise
25/10 kV Substation – Expansion for Public Transport SystemsThe Hague Area (NL)Site Acceptance - Switching coordinatorGrid Operator
25 kV Substation – Upgrade for Implementation SCADAThe Hague Area (NL)Test coordinatorGrid Operator
25/10 kV Distribution System - Industrial AreaDordrecht Area (NLFault Analysis for underground cabling systemProject Developer / Operating Contractor
150 kV Switchyard – Refurbishment programRotterdam AreaPre-commissioningConstruction Contractor
25 kV regional transport line – expansionRotterdam Area (NL)Protective Relay – Integration&Design ReviewEngineering Contractor
10 kV client distribution systemBreda (NL)Transformer fire accident – fault assessment and analysis, 3rd party loss adjustmentFor Loss Adjust at Diary Food Producer
154 kV switch yardNDAEngineering representative during manufacturer investigation for disconnector failureEngineering Contractor (Japan)
25/10 kV substationZwijndrecht (NL)Consultancy for Harmonics Reduction and Load Distribution Analysis 25/10 kV transformer feedersOffshore construction yard operator

Languages

Skills

Commodities