Javad Yazdanfar is a Mechanical Inspector and Expeditor with over 7 years of hands-on experience across oil & gas, power generation, and manufacturing. He has inspected mechanical components, piping systems, pressure vessels, rotating equipment, structural assemblies, compressors, valves, electric motors, gearboxes, and filters for compliance with international codes and standards. His experience includes reviewing technical documentation, welding procedures, NDT reports, material certifications, ITPs, manufacturer data books, and project records, together with controlling welding, PMI, NDT, mechanical, functional, and factory acceptance testing. He has also delivered expediting and vendor-surveillance activities covering procurement documentation, material availability, manufacturing progress, milestone tracking, sub-vendor follow-up, pre-shipment inspection, and corrective actions.
projects: table row differs from source — check column alignment: | Ideematec | ACWA Power | Safe Tracking System | Visual Check |
projects: table row differs from source — check column alignment: | (Netherlocks) | KOC | Key Interlocks | Document Review |
projects: table row differs from source — check column alignment: | BBM Akustik | KNPC | Steam Silencer | Dimensional check |
projects: table row differs from source — check column alignment: | BKS | KOC | BUSDUCT | Final Inspection |
projects: table row differs from source — check column alignment: | Sick AG | Mapna Group | Gas analyser and its accessories | final inspection of
projects: table row differs from source — check column alignment: | Mediseal | Biosun | 1 Set, CP3 Blister Machine with manual feeding table for S
projects: table row differs from source — check column alignment: | VS&E | Petrojet | Check Valve 1”, 2”, 4”, 6”, 10” | Final Inspection / Factory
projects: table row differs from source — check column alignment: | CRYOSTAR /SIEMENS | LOHER | Electrical motors | Electrical and mechanical test
projects: table row differs from source — check column alignment: | BORRI | south pars gas field | AC MODULAR UPS 5kVA 400/230V | FAT routine test
projects: table row differs from source — check column alignment: | Schorch | Dorriz | Centrifugal Pumps type 3. T Electric motor for P-7106 A and
projects: table row differs from source — check column alignment: | Metso | GS E&C | Butterfly Valve | Shell pressure, seat leakage and functional
projects: table row differs from source — check column alignment: | EPC BARZAN PROJECT | PIPELINE | EEW BERGROHR GMBH | VISUAL, DIMENSIONAL, NDE |
projects: table row differs from source — check column alignment: | Elpa Germany Co | Gas Co. | Kebulen Tapes | Visual and Properties Check under
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Penetrant examination at the Main impeller | Leakage Tes
projects: table row differs from source — check column alignment: | Cryostar, France | TOTAL | Turbo expander compressor | Mechanical Running Test
projects: table row differs from source — check column alignment: | MAN Diesel | Techinco | Cover, Autoclace Cover | Pressure and Gas leak test of
projects: table row differs from source — check column alignment: | Schenck | Technip | mechanical equipment black line & electrical equipment nat
projects: table row differs from source — check column alignment: | Borsig | P.K.S.K. Co | Oil cooler 149-K-101/102 | Attendance at manufacturing
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Compressor casing Unit 2 | Attendance at manufacturing Q
projects: table row differs from source — check column alignment: | Gesellschaft für Oeltechnik mbH | OTCE | Oil Unit CS3-3 with unit no. 09000033
projects: table row differs from source — check column alignment: | MAN Diesel | EORC | Spare Rotor, Unit C-6601 | Low speed balancing of the roto
projects: table row differs from source — check column alignment: | BORRI | RAPID PMT | AC&DC UPS | PIM- Pre inspection meeting |
projects: table row differs from source — check column alignment: | EMERSON, CHLORIDE | EORC | UPS | PIM, FAT Final inspection |
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Rotor (spare) for unit C6601 | Overspeed test, NDT, High
projects: table row differs from source — check column alignment: | Linde | EORC | Pressure swing adsorption unit + Spare parts | Packing for land
projects: table row differs from source — check column alignment: | Aerzener Machinenfabrik | Energy engineering | PCS Blower LLDPE, PCS Blower HD
projects: table row differs from source — check column alignment: | AZ Armaturen | NIOC | Plug Valve | Document check; Visual inspection |
projects: table row differs from source — check column alignment: | AZ Armaturen | Jondashipour | Plug Valve | Dimensional check, Final inspection
projects: table row differs from source — check column alignment: | BRUSH | KOC | Electrical Generator | Final inspection on Electrical Generator
projects: table row differs from source — check column alignment: | ABB | Petronas | Electrical motors | Electrical, and, mechanical, tests; Final
projects: table row differs from source — check column alignment: | Leser International General Trading | Alghanim | Pressure Safety Valves | PMI
projects: table row differs from source — check column alignment: | HYOSUNG | LEWA GmbH | Metering Pumps | Performance / function test; Hydrostati
projects: table row differs from source — check column alignment: | BKS Stromschienen AG | PETROJET | BUSDUCT | Final Inspection; Visual Inspectio
projects: table row differs from source — check column alignment: | Vallourec Plant Germany | CNOOC MISSAN OIL CO | Pipeline for BU South Area Wat
projects: table row differs from source — check column alignment: | Vallourec Germany Plant Mülheim | SONATRACH DIVISION PRODUCTION ALGERIA | Seam
projects: table row differs from source — check column alignment: | LEWA GmbH | 2113-NOT-1-RE-309-001 | Metering pumps | Visual check, hydrostatic
projects: table row differs from source — check column alignment: | V&M Plug Mill Düsseldorf Rath | OCEAN MIGHT / TALISMAN ENERGY | Seamless Steel
projects: table row differs from source — check column alignment: | BAF Valves, Oosterhout | FOR SEVENTH CRUDE OIL STORAGE TANK AT ZIRKU Project |
projects: table row differs from source — check column alignment: | Ruhrpumpen GmbH Witten | FAO Project | pipeline systems pump skid | Test for o
projects: table row differs from source — check column alignment: | SAMSON AG Frankfurt | REPSOL Project Spain | Automatic Regulated Control Valve
projects: table row differs from source — check column alignment: | PFEIFFER VACUUM GMBH | KOC | Vacuum pump | Visual check, hydrostatic test, NPS
projects: table row differs from source — check column alignment: | Shanghai HeatTech Co., Ltd. | Petropars Ltd. | Heat Exchangers | Visual and di
projects: table row differs from source — check column alignment: | Perrin GmbH Nidderau / Frankfurt | Motiva Enterprises LLC | Ball Valves to ANS
projects: table row differs from source — check column alignment: | Aker Wirth GmbH Erkelenz | P6056 MARINER Topside EPC Project | Mariner HP Mud
projects: table row differs from source — check column alignment: | Tapprogge GmbH | Jeddah South Thermal Power Plant Stage-1 | Ball debris filter
| Vendor | Client | Item | Service Type |
|---|
| Bushehr Co. | Jam Petrochemical | Stack Support in 108 X 101 | Adjust, modify, and dimension |
| KROHNE MESSTECHNIK GMBH | JGC/ SLB | Area Flowmeter | FAT Packing inspection Document review |
| VEGA | KOC | Radar Transmitter | Quantity check |
| Bandarabbas Refinery Co | Falat Ghare | Thermowell | Document check, Final inspection |
| Arvos Group | CONSORCIO PMC TALARA | Waste Heat Boiler - PHP | PMI 100% EXAMINATION on Deposited Welds Metal Before PWHT PT ON ALL AREAS WHERE TEMPORATORY ATTACHMENTS WERE REMOVED Before PWHT Check of ANCHOR Installation (Include. Bend Test) DIMENSIONAL CHECK OF CHANNEL BEFORE PWHT |
| Jam Petro Co | NIGC | Exchanger Tubes bundle cleaning | Acid Cleaning Package |
| Atlas Colufkinpco | INDORAMA | Compressor | PIM |
| Assaluyeh | NIGC | redesign and adjusting |
| Endress-Hauser | south pars gas field | Transmitter | Quantity check |
| Welland & Tuxhorn AG | Punjab Thermal Power | Steam Converting | Hydrostatic Pressure Test |
| Pipe | FINESCO | ERNDTEBRUECKER | Packing Inspection |
| KSB | TERNA S.A | FGD Manual Butterfly Valves | "REVIEW OF FINAL BOOK |
| H. Butting GmbH & Co. KG | EIED | Various Pipes | Surface Finish Test |
| Ideematec | ACWA Power | Safe Tracking System | Visual Check |
| LESER GmbH & Co.KG | KOC | safety Valves | Hydraulic Pressure/ Vacuum Test |
| ATV | M/s Rotork Controls Limited | IQT Actuator, MOV Master Station, Gearbox | Perform Expediting and witness FAT, Performance Test, Mechanical and Electrical Test, Visual and Dimensional Check, Final Inspection, Paint and Coating Inspection, Review document |
| ICARUS | PKSK | DUAL PLATE CHECK VALVES | Expediting |
| ABB | NARGAN | GIS (Switchgear) | Factory acceptance test |
| AUMA | Valvomeccanica | Explosion-proof actuators SAREx | FAT |
| (Netherlocks) | KOC | Key Interlocks | Document Review |
| REVERBERI | Mapna Group | flux regulator lighting | FAT |
| BBM Akustik | KNPC | Steam Silencer | Dimensional check |
| BKS | KOC | BUSDUCT | Final Inspection |
| Sick AG | Mapna Group | Gas analyser and its accessories | final inspection of gas analyser unit and its accessories. |
| Mediseal | Biosun | 1 Set, CP3 Blister Machine with manual feeding table for Syringes | Functional test witness, IO check, Marking and tagging control, Final inspection including document review |
| VS&E | Petrojet | Check Valve 1”, 2”, 4”, 6”, 10” | Final Inspection / Factory Acceptance Test |
| CRYOSTAR /SIEMENS | LOHER | Electrical motors | Electrical and mechanical tests |
| ICARUS | QatarGas | PIPE ALLOY STEEL INCONEL | sampling specimen for test |
| BORRI | south pars gas field | AC MODULAR UPS 5kVA 400/230V | FAT routine test |
| Schorch | Dorriz | Centrifugal Pumps type 3. T Electric motor for P-7106 A and P-7102A | FAT including: Performance Test; Special tests for electric motors |
| Metso | GS E&C | Butterfly Valve | Shell pressure, seat leakage and functional test; Visual inspection; Review of material certificates and reports FAT |
| TJJV/ JGC | LUFKIN | Gear Box | Surface Prepration and painting inspections activities load gearbox |
| EPC BARZAN PROJECT | PIPELINE | EEW BERGROHR GMBH | VISUAL, DIMENSIONAL, NDE |
| Elpa Germany Co | Gas Co. | Kebulen Tapes | Visual and Properties Check under certain conditions; Hydrostatic Test |
| MAN Diesel | Nargan | Penetrant examination at the Main impeller | Leakage Test; UT Examination; RT Examination; RT Interpretation; Corrosion Test; Welding Monitoring; Insulation Resistance Check |
| Cryostar, France | TOTAL | Turbo expander compressor | Mechanical Running Test Performance Test; Painting inspection |
| MAN Diesel | Techinco | Cover, Autoclace Cover | Pressure and Gas leak test of Casing |
| Schenck | Technip | mechanical equipment black line & electrical equipment natural line | FAT including: Visual Check; Component Check; Applicational Check |
| Borsig | P.K.S.K. Co | Oil cooler 149-K-101/102 | Attendance at manufacturing QC, witnessing tests; Product Certification references review; Quality Documents review; Drawings references review |
| MAN Diesel | Nargan | Compressor casing Unit 2 | Attendance at manufacturing QC, witnessing tests |
| Gesellschaft für Oeltechnik mbH | OTCE | Oil Unit CS3-3 with unit no. 090000338 (Assembled) | Operational test |
| MAN Diesel | EORC | Spare Rotor, Unit C-6601 | Low speed balancing of the rotor; High speed balancing of the rotor; Residual unbalance check |
| BORRI | RAPID PMT | AC&DC UPS | PIM- Pre inspection meeting |
| EMERSON, CHLORIDE | EORC | UPS | PIM, FAT Final inspection |
| MAN Diesel | Nargan | Rotor (spare) for unit C6601 | Overspeed test, NDT, High speed balancing and run out check |
| Linde | EORC | Pressure swing adsorption unit + Spare parts | Packing for land transport; saving control valves with foil; Marking; Preservation Check |
| Aerzener Machinenfabrik | Energy engineering | PCS Blower LLDPE, PCS Blower HDPE, PCS Compressor PP and Vacuum System Blower | Visual check; Dimensional Check; Nameplate Check; Document Review; Factory Acceptance Test |
| AZ Armaturen | NIOC | Plug Valve | Document check; Visual inspection |
| AZ Armaturen | Jondashipour | Plug Valve | Dimensional check, Final inspection and packing |
| BRUSH | KOC | Electrical Generator | Final inspection on Electrical Generator |
| ABB | Petronas | Electrical motors | Electrical, and, mechanical, tests; Final, inspections |
| Leser International General Trading | Alghanim | Pressure Safety Valves | PMI (XRF); PMI incl. C-Content; sizing and rating; performance/function test |
| HYOSUNG | LEWA GmbH | Metering Pumps | Performance / function test; Hydrostatic pressure test |
| BKS Stromschienen AG | PETROJET | BUSDUCT | Final Inspection; Visual Inspection 20% |
| Vallourec Plant Germany | CNOOC MISSAN OIL CO | Pipeline for BU South Area Water Injection System | Responsible for Final, Visual, and dimensional Inspection, 100% Witness of Mechanical Test; Hydrostatic and UT Examination; marking check; Document review and release of material |
| Vallourec Germany Plant Mülheim | SONATRACH DIVISION PRODUCTION ALGERIA | Seamless Steel Pipes | Visual and dimensional Inspection; 100% witness of Mechanical Test; Hydrostatical and UT Examination; HIC and SSC according to NACE; Document review and release of material |
| LEWA GmbH | 2113-NOT-1-RE-309-001 | Metering pumps | Visual check, hydrostatic test, NPSH test, Performance test |
| V&M Plug Mill Düsseldorf Rath | OCEAN MIGHT / TALISMAN ENERGY | Seamless Steel Pipes | Visual and dimensional inspection; Monitoring and witness of hydrostatic and UT examination; Document review and release of material |
| BAF Valves, Oosterhout | FOR SEVENTH CRUDE OIL STORAGE TANK AT ZIRKU Project | Flat Face valves & 10’’ BAF Rubber Lined Butterfly Valve | Hydro Tests, Pneumatic Tests and Final Inspections |
| Ruhrpumpen GmbH Witten | FAO Project | pipeline systems pump skid | Test for observance of order specifications; marking; visual and dimensional check; equipment installation; cable wiring; instrument installation; document checks |
| SAMSON AG Frankfurt | REPSOL Project Spain | Automatic Regulated Control Valves | Visual and dimensional check; tightness and seat leakage tests; operating function test; cleanliness inspection; test documentation verification |
| PFEIFFER VACUUM GMBH | KOC | Vacuum pump | Visual check, hydrostatic test, NPSH test, performance test, NDE, painting check |
| Shanghai HeatTech Co., Ltd. | Petropars Ltd. | Heat Exchangers | Visual and dimensional check of raw materials; fit-up inspection before welding; NDT; hydrostatic test |
| Perrin GmbH Nidderau / Frankfurt | Motiva Enterprises LLC | Ball Valves to ANSI Class 2500 DN 10” | Inspection, NDE, hydrostatic test, painting, dimensional and marking check, functional test, helium leak test, packing and document checks |
| Aker Wirth GmbH Erkelenz | P6056 MARINER Topside EPC Project | Mariner HP Mud Pumps | FAT and final inspection; welding; NDE; hydrostatic test; pickling and passivation for piping and pump; painting |
| Tapprogge GmbH | Jeddah South Thermal Power Plant Stage-1 | Ball debris filter with motor | Visual and dimensional inspection; cleaning, lining and painting inspection; function/mechanical run test |