Fulkrum — Standardized CV (PoC)

Javad Yazdanfar

Summary

Javad Yazdanfar is a Mechanical Inspector and Expeditor with over 7 years of hands-on experience across oil & gas, power generation, and manufacturing. He has inspected mechanical components, piping systems, pressure vessels, rotating equipment, structural assemblies, compressors, valves, electric motors, gearboxes, and filters for compliance with international codes and standards. His experience includes reviewing technical documentation, welding procedures, NDT reports, material certifications, ITPs, manufacturer data books, and project records, together with controlling welding, PMI, NDT, mechanical, functional, and factory acceptance testing. He has also delivered expediting and vendor-surveillance activities covering procurement documentation, material availability, manufacturing progress, milestone tracking, sub-vendor follow-up, pre-shipment inspection, and corrective actions.

projects: table row differs from source — check column alignment: | Ideematec | ACWA Power | Safe Tracking System | Visual Check |
projects: table row differs from source — check column alignment: | (Netherlocks) | KOC | Key Interlocks | Document Review |
projects: table row differs from source — check column alignment: | BBM Akustik | KNPC | Steam Silencer | Dimensional check |
projects: table row differs from source — check column alignment: | BKS | KOC | BUSDUCT | Final Inspection |
projects: table row differs from source — check column alignment: | Sick AG | Mapna Group | Gas analyser and its accessories | final inspection of
projects: table row differs from source — check column alignment: | Mediseal | Biosun | 1 Set, CP3 Blister Machine with manual feeding table for S
projects: table row differs from source — check column alignment: | VS&E | Petrojet | Check Valve 1”, 2”, 4”, 6”, 10” | Final Inspection / Factory
projects: table row differs from source — check column alignment: | CRYOSTAR /SIEMENS | LOHER | Electrical motors | Electrical and mechanical test
projects: table row differs from source — check column alignment: | BORRI | south pars gas field | AC MODULAR UPS 5kVA 400/230V | FAT routine test
projects: table row differs from source — check column alignment: | Schorch | Dorriz | Centrifugal Pumps type 3. T Electric motor for P-7106 A and
projects: table row differs from source — check column alignment: | Metso | GS E&C | Butterfly Valve | Shell pressure, seat leakage and functional
projects: table row differs from source — check column alignment: | EPC BARZAN PROJECT | PIPELINE | EEW BERGROHR GMBH | VISUAL, DIMENSIONAL, NDE |
projects: table row differs from source — check column alignment: | Elpa Germany Co | Gas Co. | Kebulen Tapes | Visual and Properties Check under
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Penetrant examination at the Main impeller | Leakage Tes
projects: table row differs from source — check column alignment: | Cryostar, France | TOTAL | Turbo expander compressor | Mechanical Running Test
projects: table row differs from source — check column alignment: | MAN Diesel | Techinco | Cover, Autoclace Cover | Pressure and Gas leak test of
projects: table row differs from source — check column alignment: | Schenck | Technip | mechanical equipment black line & electrical equipment nat
projects: table row differs from source — check column alignment: | Borsig | P.K.S.K. Co | Oil cooler 149-K-101/102 | Attendance at manufacturing
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Compressor casing Unit 2 | Attendance at manufacturing Q
projects: table row differs from source — check column alignment: | Gesellschaft für Oeltechnik mbH | OTCE | Oil Unit CS3-3 with unit no. 09000033
projects: table row differs from source — check column alignment: | MAN Diesel | EORC | Spare Rotor, Unit C-6601 | Low speed balancing of the roto
projects: table row differs from source — check column alignment: | BORRI | RAPID PMT | AC&DC UPS | PIM- Pre inspection meeting |
projects: table row differs from source — check column alignment: | EMERSON, CHLORIDE | EORC | UPS | PIM, FAT Final inspection |
projects: table row differs from source — check column alignment: | MAN Diesel | Nargan | Rotor (spare) for unit C6601 | Overspeed test, NDT, High
projects: table row differs from source — check column alignment: | Linde | EORC | Pressure swing adsorption unit + Spare parts | Packing for land
projects: table row differs from source — check column alignment: | Aerzener Machinenfabrik | Energy engineering | PCS Blower LLDPE, PCS Blower HD
projects: table row differs from source — check column alignment: | AZ Armaturen | NIOC | Plug Valve | Document check; Visual inspection |
projects: table row differs from source — check column alignment: | AZ Armaturen | Jondashipour | Plug Valve | Dimensional check, Final inspection
projects: table row differs from source — check column alignment: | BRUSH | KOC | Electrical Generator | Final inspection on Electrical Generator
projects: table row differs from source — check column alignment: | ABB | Petronas | Electrical motors | Electrical, and, mechanical, tests; Final
projects: table row differs from source — check column alignment: | Leser International General Trading | Alghanim | Pressure Safety Valves | PMI
projects: table row differs from source — check column alignment: | HYOSUNG | LEWA GmbH | Metering Pumps | Performance / function test; Hydrostati
projects: table row differs from source — check column alignment: | BKS Stromschienen AG | PETROJET | BUSDUCT | Final Inspection; Visual Inspectio
projects: table row differs from source — check column alignment: | Vallourec Plant Germany | CNOOC MISSAN OIL CO | Pipeline for BU South Area Wat
projects: table row differs from source — check column alignment: | Vallourec Germany Plant Mülheim | SONATRACH DIVISION PRODUCTION ALGERIA | Seam
projects: table row differs from source — check column alignment: | LEWA GmbH | 2113-NOT-1-RE-309-001 | Metering pumps | Visual check, hydrostatic
projects: table row differs from source — check column alignment: | V&M Plug Mill Düsseldorf Rath | OCEAN MIGHT / TALISMAN ENERGY | Seamless Steel
projects: table row differs from source — check column alignment: | BAF Valves, Oosterhout | FOR SEVENTH CRUDE OIL STORAGE TANK AT ZIRKU Project |
projects: table row differs from source — check column alignment: | Ruhrpumpen GmbH Witten | FAO Project | pipeline systems pump skid | Test for o
projects: table row differs from source — check column alignment: | SAMSON AG Frankfurt | REPSOL Project Spain | Automatic Regulated Control Valve
projects: table row differs from source — check column alignment: | PFEIFFER VACUUM GMBH | KOC | Vacuum pump | Visual check, hydrostatic test, NPS
projects: table row differs from source — check column alignment: | Shanghai HeatTech Co., Ltd. | Petropars Ltd. | Heat Exchangers | Visual and di
projects: table row differs from source — check column alignment: | Perrin GmbH Nidderau / Frankfurt | Motiva Enterprises LLC | Ball Valves to ANS
projects: table row differs from source — check column alignment: | Aker Wirth GmbH Erkelenz | P6056 MARINER Topside EPC Project | Mariner HP Mud
projects: table row differs from source — check column alignment: | Tapprogge GmbH | Jeddah South Thermal Power Plant Stage-1 | Ball debris filter

Education

M. Sc.Energy EngineeringTehran University, Iran
B. Sc.Chemical EngineeringTehran University, Iran

Qualifications and Training

Previous Fulkrum Work Experience

YearScope VendorScope TypeMaterial Description
2026Bollfilter (Boll & Kirch Filterbau GmbH)InspectionSeawater Coarse Filter
2026Boll & Kirch Filterbau GmbHInspectionPRESSURE SAFETY VALVES
2026Bollfilter (Boll & Kirch Filterbau GmbH)InspectionSeawater Coarse Filter
2026Bollfilter (Boll & Kirch Filterbau GmbH)InspectionInspection of Material at Source (raw)
2025Wilhelm Maass GmbHInspectionInspection of Material at Source (raw)
2025Konig & Co GmbHInspectionInspection of Material at Source (raw)
2025W. Albrecht GmbH & Co. KGInspectionInspection of Material at Source (raw)
2025ARVOS, KasselInspectionTransfer Line Exchanger
2025Everllence SEInspectionCompressor Package
2025Petronik GmbHInspectionHDPE Extruder (320-X-6040)

Work Experience

2023 – Present TPI AGENCY
Technical Inspector and Expeditor
2020 – 2023 FREELANCE (Various clients)
2018 – 2020 TPI AGENCY
Technical Inspector

Projects

VendorClientItemService Type
Bushehr Co.Jam PetrochemicalStack Support in 108 X 101Adjust, modify, and dimension
KROHNE MESSTECHNIK GMBHJGC/ SLBArea FlowmeterFAT Packing inspection Document review
VEGAKOCRadar TransmitterQuantity check
Bandarabbas Refinery CoFalat GhareThermowellDocument check, Final inspection
Arvos GroupCONSORCIO PMC TALARAWaste Heat Boiler - PHPPMI 100% EXAMINATION on Deposited Welds Metal Before PWHT PT ON ALL AREAS WHERE TEMPORATORY ATTACHMENTS WERE REMOVED Before PWHT Check of ANCHOR Installation (Include. Bend Test) DIMENSIONAL CHECK OF CHANNEL BEFORE PWHT
Jam Petro CoNIGCExchanger Tubes bundle cleaningAcid Cleaning Package
Atlas ColufkinpcoINDORAMACompressorPIM
AssaluyehNIGCredesign and adjusting
Endress-Hausersouth pars gas fieldTransmitterQuantity check
Welland & Tuxhorn AGPunjab Thermal PowerSteam ConvertingHydrostatic Pressure Test
PipeFINESCOERNDTEBRUECKERPacking Inspection
KSBTERNA S.AFGD Manual Butterfly Valves"REVIEW OF FINAL BOOK
H. Butting GmbH & Co. KGEIEDVarious PipesSurface Finish Test
IdeematecACWA PowerSafe Tracking SystemVisual Check
LESER GmbH & Co.KGKOCsafety ValvesHydraulic Pressure/ Vacuum Test
ATVM/s Rotork Controls LimitedIQT Actuator, MOV Master Station, GearboxPerform Expediting and witness FAT, Performance Test, Mechanical and Electrical Test, Visual and Dimensional Check, Final Inspection, Paint and Coating Inspection, Review document
ICARUSPKSKDUAL PLATE CHECK VALVESExpediting
ABBNARGANGIS (Switchgear)Factory acceptance test
AUMAValvomeccanicaExplosion-proof actuators SARExFAT
(Netherlocks)KOCKey InterlocksDocument Review
REVERBERIMapna Groupflux regulator lightingFAT
BBM AkustikKNPCSteam SilencerDimensional check
BKSKOCBUSDUCTFinal Inspection
Sick AGMapna GroupGas analyser and its accessoriesfinal inspection of gas analyser unit and its accessories.
MedisealBiosun1 Set, CP3 Blister Machine with manual feeding table for SyringesFunctional test witness, IO check, Marking and tagging control, Final inspection including document review
VS&EPetrojetCheck Valve 1”, 2”, 4”, 6”, 10”Final Inspection / Factory Acceptance Test
CRYOSTAR /SIEMENSLOHERElectrical motorsElectrical and mechanical tests
ICARUSQatarGasPIPE ALLOY STEEL INCONELsampling specimen for test
BORRIsouth pars gas fieldAC MODULAR UPS 5kVA 400/230VFAT routine test
SchorchDorrizCentrifugal Pumps type 3. T Electric motor for P-7106 A and P-7102AFAT including: Performance Test; Special tests for electric motors
MetsoGS E&CButterfly ValveShell pressure, seat leakage and functional test; Visual inspection; Review of material certificates and reports FAT
TJJV/ JGCLUFKINGear BoxSurface Prepration and painting inspections activities load gearbox
EPC BARZAN PROJECTPIPELINEEEW BERGROHR GMBHVISUAL, DIMENSIONAL, NDE
Elpa Germany CoGas Co.Kebulen TapesVisual and Properties Check under certain conditions; Hydrostatic Test
MAN DieselNarganPenetrant examination at the Main impellerLeakage Test; UT Examination; RT Examination; RT Interpretation; Corrosion Test; Welding Monitoring; Insulation Resistance Check
Cryostar, FranceTOTALTurbo expander compressorMechanical Running Test Performance Test; Painting inspection
MAN DieselTechincoCover, Autoclace CoverPressure and Gas leak test of Casing
SchenckTechnipmechanical equipment black line & electrical equipment natural lineFAT including: Visual Check; Component Check; Applicational Check
BorsigP.K.S.K. CoOil cooler 149-K-101/102Attendance at manufacturing QC, witnessing tests; Product Certification references review; Quality Documents review; Drawings references review
MAN DieselNarganCompressor casing Unit 2Attendance at manufacturing QC, witnessing tests
Gesellschaft für Oeltechnik mbHOTCEOil Unit CS3-3 with unit no. 090000338 (Assembled)Operational test
MAN DieselEORCSpare Rotor, Unit C-6601Low speed balancing of the rotor; High speed balancing of the rotor; Residual unbalance check
BORRIRAPID PMTAC&DC UPSPIM- Pre inspection meeting
EMERSON, CHLORIDEEORCUPSPIM, FAT Final inspection
MAN DieselNarganRotor (spare) for unit C6601Overspeed test, NDT, High speed balancing and run out check
LindeEORCPressure swing adsorption unit + Spare partsPacking for land transport; saving control valves with foil; Marking; Preservation Check
Aerzener MachinenfabrikEnergy engineeringPCS Blower LLDPE, PCS Blower HDPE, PCS Compressor PP and Vacuum System BlowerVisual check; Dimensional Check; Nameplate Check; Document Review; Factory Acceptance Test
AZ ArmaturenNIOCPlug ValveDocument check; Visual inspection
AZ ArmaturenJondashipourPlug ValveDimensional check, Final inspection and packing
BRUSHKOCElectrical GeneratorFinal inspection on Electrical Generator
ABBPetronasElectrical motorsElectrical, and, mechanical, tests; Final, inspections
Leser International General TradingAlghanimPressure Safety ValvesPMI (XRF); PMI incl. C-Content; sizing and rating; performance/function test
HYOSUNGLEWA GmbHMetering PumpsPerformance / function test; Hydrostatic pressure test
BKS Stromschienen AGPETROJETBUSDUCTFinal Inspection; Visual Inspection 20%
Vallourec Plant GermanyCNOOC MISSAN OIL COPipeline for BU South Area Water Injection SystemResponsible for Final, Visual, and dimensional Inspection, 100% Witness of Mechanical Test; Hydrostatic and UT Examination; marking check; Document review and release of material
Vallourec Germany Plant MülheimSONATRACH DIVISION PRODUCTION ALGERIASeamless Steel PipesVisual and dimensional Inspection; 100% witness of Mechanical Test; Hydrostatical and UT Examination; HIC and SSC according to NACE; Document review and release of material
LEWA GmbH2113-NOT-1-RE-309-001Metering pumpsVisual check, hydrostatic test, NPSH test, Performance test
V&M Plug Mill Düsseldorf RathOCEAN MIGHT / TALISMAN ENERGYSeamless Steel PipesVisual and dimensional inspection; Monitoring and witness of hydrostatic and UT examination; Document review and release of material
BAF Valves, OosterhoutFOR SEVENTH CRUDE OIL STORAGE TANK AT ZIRKU ProjectFlat Face valves & 10’’ BAF Rubber Lined Butterfly ValveHydro Tests, Pneumatic Tests and Final Inspections
Ruhrpumpen GmbH WittenFAO Projectpipeline systems pump skidTest for observance of order specifications; marking; visual and dimensional check; equipment installation; cable wiring; instrument installation; document checks
SAMSON AG FrankfurtREPSOL Project SpainAutomatic Regulated Control ValvesVisual and dimensional check; tightness and seat leakage tests; operating function test; cleanliness inspection; test documentation verification
PFEIFFER VACUUM GMBHKOCVacuum pumpVisual check, hydrostatic test, NPSH test, performance test, NDE, painting check
Shanghai HeatTech Co., Ltd.Petropars Ltd.Heat ExchangersVisual and dimensional check of raw materials; fit-up inspection before welding; NDT; hydrostatic test
Perrin GmbH Nidderau / FrankfurtMotiva Enterprises LLCBall Valves to ANSI Class 2500 DN 10”Inspection, NDE, hydrostatic test, painting, dimensional and marking check, functional test, helium leak test, packing and document checks
Aker Wirth GmbH ErkelenzP6056 MARINER Topside EPC ProjectMariner HP Mud PumpsFAT and final inspection; welding; NDE; hydrostatic test; pickling and passivation for piping and pump; painting
Tapprogge GmbHJeddah South Thermal Power Plant Stage-1Ball debris filter with motorVisual and dimensional inspection; cleaning, lining and painting inspection; function/mechanical run test