M. Yavari has over five years of experience in quality control and project management across diverse industries and large-scale operational construction projects, including five years as a QC Inspector and three years as a Project Manager. Experience covers pipelines, pressure vessels, flanges, boilers, rotating equipment, hydro-turbine components, and prefabricated architectural and building-envelope systems. M. Yavari has performed second- and third-party surveillance, technical consulting, stage-wise manufacturing inspections, document review, and inspection reporting for medium- and high-voltage electrical equipment and other industrial products. The scope also includes NDT, HSE and quality-management requirements, ISO, ASME, and API standards, ITP verification, NCR follow-up, corrective actions, and final release inspections.
| Type of Inspection (Product) | Inspection activity | Name of Supplier | Client |
|---|---|---|---|
| N2 generator | Visual Check Hydrostatics test FAT test Painting and coating Documents review PT Leakage test Final inspection | Omega Air d.o.o | PSPP |
| Containers | VT MT FAT test Machining | Container d.o.o | Kärcher |
| Ballistor | VT MT FAT test Machining | Container d.o.o | PSPP |
| Runner Guide vane | FAT test UT MT PT VT Balancing Casting Machining | ScottaTurboinštitut d.o.o. | PSPP |
| Hydrostatic pressure Test | Functional test Flange alignment Spot checks | Flenco d.o.o. | 3B Eng Co |
| SEAL GAS EXTERNAL SKID | Visual test Documents review | Flenco d.o.o. | 3B Eng Co |
| SEAL GAS EXTERNAL SKID | Visual Leak test Dimensional check FAT test | Flenco d.o.o. | 3B Eng Co |
| Piping and assembled Welded piping Water washing pump motor inspection | Visual Dimensional check FAT test | Flenco d.o.o. | 3B Eng Co |
| Off/on line washing skid | Functional test | Flenco d.o.o. | 3B Eng Co |
| SEAL GAS EXTERNAL SKID | Final check Visual check | Flenco d.o.o. | 3B Eng Co |
| FAT Low-pressure Filter inclusive Purge gas Vessel for Compressor Guard Filter | Welding Dimensions Documentation and visual inspection of the Pressure Vessel Ferrit testing on pressure-containing PMI Leakage Test PT Pickling and Passivation Hydrostatic test Painting check | Flenco d.o.o. | 3B Eng Co |
| GT Exhaust Silencer, Bellow, and Expansion joint | Final inspection and shipment release inspection Manufacturing data book review Visual and Weight and Dimensional Check Spare verification Packing & preservation Identification Marking/Tagging Insulation inspection | Flenco d.o.o. | 3B Eng Co |
| GAS TURBINE-DRIVEN EXPORT GAS COMPRESSORS FOR PLATFORMS CP6S & CP7S | Visual check Dimension check Leak test As-Built inspection continuity inspection Completeness Final Inspection | Flenco d.o.o. | 3B Eng Co |
| Compressors and pumps Test | Visual check Dimension check Leak test NDT tests As-Built inspection continuity inspection Completeness Final Inspection | Mega-Metal d.o.o. | 3B Eng Co |
| QMS (Audit for ISO 9001) | Conducting a thorough audit for ISO 9001 involved assessing adherence to documented processes, verifying the effectiveness of the quality management system, and providing constructive recommendations for continuous improvement. Focusing on key areas included leadership commitment, planning, operational processes, performance evaluation, and corrective/preventive actions. | ProQC | |
| Piping - assembled Welded NDT Test | Testing PT and MT | KURE d.o.o. | PSPP Co. |
| Gas Compressor | Visual check, FAT | Sinergial SRL | KNPC |
| Pressure vessel | NDTs on welding before HT | Obrtna cona | PSPP Co |
| Sandwich panels | Coating check Sample dimensional checks Sample and review | Mitol.si | PSPP Co. |
| Nitrogen Generator Package Hydrostatic Test | Visual and dimension check | Omega Air | JSP Inspection Co. |
| Pressure vessel NDT test | PT, MT, VT and dimension check | Omega Air | JSP Inspection Co. |
| Air Compressors | Hydrostatic Test | Omega Air | JSP Inspection Co. |
| Hot-rolled stainless-steel plates | Visual and documentational inspection | Sij Acroni | PSPP Co. |
| Magnetic Particle test on welds | MT and UT test | IMK Inštitut | PSPP Co. |
| Hydrostatic pressure | Test pressure vessels | Flenco | PSPP Co. |
| Centrifuge pump | 100% NDTs | Logistika d.o.o. | 3B Eng Co |
| Pumps and spare parts | Visual PT RT MPI functional dimension check | Logistika d.o.o. | 3B Eng Co |
| Expediting visit and NDT | 100% NDTs | Andino d.o.o. | ACES-GQS |
| UT test and Dimensional test | - UT, acceptance criteria are at least EN 10228-3 class 3 (if the supplier proposes class 4, even better); - Dimensional test, with the last version of the drawing that they have at workshop (to be attached to the report, indicated if the drawing has been shared and discussed with enel or not); - Coupon stamping: after marking the piece, a ring will be cut and then processed to make the specimens for the mechanical tests; | ScottaTurboinštitut d.o.o. | PSPP Co. |
| Fertilizer Project, Cooked Chicken packaging | Visual Test | Gemlik fertilizer inc. Perutnina Ptuj Group | PSPP Co. |
| Vinchiana Runner and Runner Cone VT, PT, Measurements and Roughness tests | -100% NDTs on welds (the supplier postponed this step from “after PWHT” to “after machining”), 100% of test has to be done; -Fat runner; -Fat runner cone; -Lab tests on test coupon; -Final inspection of components; -The inspector has also to collect and attach the previous balancing report | ANDINO Hydropower Engineering d.o.o. | PSPP Co. |
| Air Compressor | FAT | Sicom Srl | KNPC CFP MAA |
| Vinchiana Runner MT, UT and Hardness tests | 100% NDTs on welds | ANDINO Hydropower Engineering d.o.o. | PSPP Co. |
| Weld impact | Tensile tests | Inštitut za metalne konstrukcije | PSPP Co. |
| Pressure vessels tdf | Ecom Ruse d.o.o. | Thorough Inspection of Pressure Vessel TDF Repair Process: Comprehensive NDT Testing, Including VT, RT, PT, UT, PMI, Ferrite Testing, and Hydrostatic Pressure Test | PSPP Co. |
| Vinchina francis runner | Andino hydropower engineering ltd. (France) | Heat treatment and NDT test | PSPP Co. |
| Giranti francis | Andino- slovenia | Complete Weld Inspection: 100% NDT Coverage | PSPP Co. |
| fat runner fat runner cone | Andino- slovenia | Complete Weld Inspection: 100% NDT Coverage | PSPP Co. |
| Gas Compressor | Visual & Dimensional check, MRT | Rotair Spa | Dragon LNG |
| Pressure Vessel Repair Process Inspection | Gomma line d.o.o. | NDT Testing: VT, RT, PT, UT, PMI, Ferrite Testing Hydrostatic Test Pressure Duration: December 2022, to March 2023 | PSPP Co. |
| CRA Cladded (HRB) Line Pipe for Hail & Ghasha | Voestalpine Austria | Visual and NDT inspection. | PSPP Co. |
| Pump and compressor | Functional test NDTs Visual Flange alignment Spot checks | Flenco d.o.o. | PSPP Co. |
| Compressors | Visual Check, Hydrostatic Test, Performance Test | Garo Gabbioneta | FADHILI GAS PROJECT |
| QMS (Audit for ISO 9001) | Conducting a thorough audit for ISO 9001 involved assessing adherence to documented processes, verifying the effectiveness of quality management systems, and providing constructive recommendations for continual improvement. Focusing on key areas included leadership commitment, planning, operational processes, performance evaluation, and corrective/preventive actions. | Engineering d.o.o. | PSPP Co. |
| 3-phase Geafol – transformer | Validate Electrical and Instrumentation Installations, Encompassing Tagging, Instrument Certification, Setting/Calibration, Painting, Dimensional Checks, and Final Visual Inspections, Including Auxiliaries. Perform a Three-Way Check (Cross-Verification at the Manufacturer's Premises Before Shipment) for Consistency in Listings, Drawings, and Materials. | Siemens Energy Berlin | PSPP Co. |
| Transformer | Conducted impulse voltage testing on individual bars to ensure electrical insulation integrity. Supervised test field runs for stator winding to verify operational performance. Performed ohmic resistance tests on stators to ensure compliance with electrical specifications. | Siemens - Nürnberg | PSPP Co. |
| Earthing transformer | Performed visual and dimensional checks to verify physical specifications. Conducted Factory Acceptance Testing (FAT) to ensure the transformers met required standards before delivery. | Kolektor etra | PSPP Co. |