Fulkrum — Standardized CV (PoC)

Segun Osidele

Summary

Segun Osidele is an API 510 Inspector and QA/QC professional with many years of experience in the energy industry, specializing in mechanical integrity across oil field, refinery, chemical, petrochemical, gas plant, and FLNG environments. He has performed internal and external inspections of pressure vessels, exchangers, drums, heaters, towers, piping systems, welds, flanges, and gasket seating surfaces. His experience includes QA/QC inspection of piping fabrications, repairs, and pressure-vessel alterations, as well as witnessing load and pressure testing on exchangers and piping systems. Segun has supported major clients and facilities including ExxonMobil, Chevron Phillips, Valero, P66, Enterprise, Kinder Morgan, and Dow. He also prepares inspection reports, reviews turnover packages, and conducts Job Safety Analysis.

summary may omit high-priority source evidence: API 510 Inspector with API 510 credential #49782, expiring 11/30/28.
summary repeats certification detail from qualifications (API 510) — review

Education

Qualifications and Training

Work Experience

Oct 2021 – Oct 2026 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Foley Specialty Services; dates overlap with Loenbro Inspection; dates overlap with Southern Services Inc; dates overlap with Team Industrial Services; dates overlap with Sentinel Integrity Inspection; dates overlap with Engineering Inspection Services; dates overlap with Spartan Company; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Tear1 Integrity; dates overlap with Weld Spec Inspection; employer replaced on AI judgment alone — verify agency status
May 2024 – Nov 2025 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Loenbro Inspection; dates overlap with Southern Services Inc; dates overlap with Team Industrial Services; dates overlap with Sentinel Integrity Inspection; dates overlap with Engineering Inspection Services; employer replaced on AI judgment alone — verify agency status
Jun 2025 – Jun 2025 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Foley Specialty Services
Feb 2025 – May 2025 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Foley Specialty Services; employer replaced on AI judgment alone — verify agency status
Jan 2025 – Feb 2025 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Foley Specialty Services; employer replaced on AI judgment alone — verify agency status
Sep 2016 – Oct 2024 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Foley Specialty Services; dates overlap with Engineering Inspection Services; dates overlap with Spartan Company; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Tear1 Integrity; dates overlap with Weld Spec Inspection; dates overlap with Precision NDT; dates overlap with Mistras Inspection; dates overlap with ABS Consulting; dates overlap with Techcorr Inspection Services; dates overlap with Amerapex Corporation
Aug 2024 – Sep 2024 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Foley Specialty Services; dates overlap with Sentinel Integrity Inspection
Mar 2023 – Sep 2023 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; employer replaced on AI judgment alone — verify agency status
Mar 2014 – Aug 2023 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with Spartan Company; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Tear1 Integrity; dates overlap with Weld Spec Inspection; dates overlap with Precision NDT; dates overlap with Mistras Inspection; dates overlap with ABS Consulting; dates overlap with Techcorr Inspection Services; dates overlap with Amerapex Corporation; dates overlap with American Inspection Services; dates overlap with CTS Inspection; dates overlap with Turner-Ind. Inspection Services; dates overlap with Intertek; dates overlap with CAN USA Inspection; employer replaced on AI judgment alone — verify agency status
Jan 2017 – Jun 2023 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with Spartan Company; dates overlap with IRIS NDT; dates overlap with Versa Integrity Group; dates overlap with Tear1 Integrity; dates overlap with Weld Spec Inspection; dates overlap with Precision NDT; dates overlap with Mistras Inspection; dates overlap with ABS Consulting; dates overlap with Techcorr Inspection Services; dates overlap with Amerapex Corporation
Mar 2019 – Aug 2022 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Tear1 Integrity; dates overlap with Weld Spec Inspection; dates overlap with Precision NDT; dates overlap with Mistras Inspection; dates overlap with ABS Consulting; dates overlap with Techcorr Inspection Services; dates overlap with Amerapex Corporation; employer replaced on AI judgment alone — verify agency status
Jul 2022 – Jul 2022 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; employer replaced on AI judgment alone — verify agency status
Jan 2020 – May 2022 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Pro-Surve Technical Services; dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Precision NDT; dates overlap with Mistras Inspection; dates overlap with ABS Consulting; dates overlap with Techcorr Inspection Services
TPI AGENCY
API 510 Inspector
⚠ Review: start date missing or unclear; end date missing or unclear
Jul 2021 – Jul 2021 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Weld Spec Inspection; employer replaced on AI judgment alone — verify agency status
Jan 2021 – Apr 2021 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Weld Spec Inspection
Dec 2019 – Nov 2020 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Weld Spec Inspection; dates overlap with Techcorr Inspection Services
Apr 2020 – Apr 2020 TPI AGENCY
API 510
⚠ Review: dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; dates overlap with Weld Spec Inspection; dates overlap with ABS Consulting
Jul 2016 – Jul 2019 TPI AGENCY
API 510
⚠ Review: dates overlap with Sentinel Integrity Inspection; dates overlap with IRIS NDT; dates overlap with Acuren Inspection; dates overlap with Versa Integrity Group; employer replaced on AI judgment alone — verify agency status
Feb 2016 – Mar 2016 TPI AGENCY
API 510
⚠ Review: dates overlap with IRIS NDT
Oct 2015 – Nov 2015 TPI AGENCY
API 510
⚠ Review: dates overlap with IRIS NDT
Apr 2015 – May 2015 TPI AGENCY
API 510
⚠ Review: dates overlap with IRIS NDT
Jul 2014 – Mar 2015 TPI AGENCY
API 510
⚠ Review: dates overlap with IRIS NDT
Apr 2014 – May 2014 TPI AGENCY
API 510 Inspector
⚠ Review: dates overlap with IRIS NDT

Projects

SEP 2026 – OCT 2026
Client: HF Sinclair Refinery, El-dorado. KS.
HF Sinclair Refinery, El-dorado. KS. (Sept to Oct 2026 TA)
OCT 2021 – OCT 2021
Client: Celanese Chemical Plant, Bay City, TX.
Celanese Chemical Plant, Bay City, TX. (Oct 2021, TA)
OCT 2025 – NOV 2025
Client: OXY Vinyls chemical Plant, Deer park, TX.
OXY Vinyls chemical Plant, Deer park, TX. (Area 100, 150, 200 and HCN units TA. Oct-Nov. 2025)
SEP 2025 – SEP 2025
Client: Nucor Steel, Donaldsonville, LA
Nucor Steel, Donaldsonville, LA (Plant wide TA Sept. 2025)
MAY 2024 – MAY 2024
Client: OXY chemical Plant, Geismar, LA.
OXY chemical Plant, Geismar, LA. (TA. May 2024)
JUN 2025 – JUN 2025
Client: Petro Hunt Gas Plant. Killdeer, North Dakota
Petro Hunt Gas Plant. Killdeer, North Dakota June 2025
Product: LPG pressure vessels
FEB 2025 – MAY 2025
Client: Ascend Performance Materials Plant. Alvin, Texas.
Ascend Performance Materials Plant. Alvin, Texas. (APM-AN7 & LAB units TA Feb, 2025 - May, 2025)
FEB 2025 – FEB 2025
Client: Enterprise Plant, Mount Belview, Texas.
Enterprise Plant, Mount Belview, Texas. Feb 2025. A week CUI project.
JAN 2025 – JAN 2025
Client: MEGlobal Canada ULC Plant, Freeport, Texas; AAM & Fab shop at Texas City, TX
MEGlobal Canada ULC Plant, Freeport, Texas Plant wide /AAM & Fab shop at Texas City, TX: TA Jan 2025
OCT 2024 – OCT 2024
Client: Indorama Petrochem. Port Arthur, TX
Indorama Petrochem. Port Arthur, TX T/A Oct 2024
DEC 2023 – MAY 2024
Client: P66 Refinery Plant, Rodeo, California.
P66 Refinery Plant, Rodeo, California. Plant Wide Renewable TA Dec 2023 – May 2024
SEP 2023 – NOV 2023
Client: Monroe Energy, Plant. Philadelphia.
Monroe Energy, Plant. Philadelphia. Plant wide TA Sept 2023 – Nov. 2023
SEP 2016 – OCT 2016
Client: PBF Energy Plant Paulsboro, NJ.
PBF Energy Plant Paulsboro, NJ. T/A Sept 2016 –Oct. 2016
AUG 2024 – SEP 2024
Client: ExxonMobil Beaumont and Baytown, TX
ExxonMobil Beaumont and Baytown, TX. Aug to Sept. 2024
Product: Pipe rack structures
AUG 2023 – SEP 2023
Client: CFI Plant, Donaldsonville, LA
CFI Plant, Donaldsonville, LA (Amonia 1 unit TA Aug, 2023-Sept, 2023)
MAR 2023 – MAR 2023
Client: OXY chemical Plant, Geismar, LA.
OXY chemical Plant, Geismar, LA. (TA. March, 2023)
JUL 2023 – AUG 2023
Client: Sinclair Refinery, Cassper, WY
Sinclair Refinery, Cassper, WY Plant wide TA July 2023 – Aug. 2023
APR 2023 – MAY 2023
Client: Sinclair Refinery, Rawlings WY
Sinclair Refinery, Rawlings WY Plant wide TA April 2023 – May 2023
JAN 2023 – FEB 2023
Client: Delek refining Plant, Tyler, Texas; Ohmstede shop at Laporte TX
Delek refining Plant, Tyler, Texas Plant wide /Ohmstede shop at Laporte TX: TA January 2023-Feb. 2023
APR 2022 – APR 2022
Client: P66 Refinery Plant, West Lake, LA
P66 Refinery Plant, West Lake, LA (PSA, 10 Reformer and 2HDS units TA April 2022)
APR 2017 – MAY 2017
Client: Tesoro Refinery Plant, North Dakota
Tesoro Refinery Plant, North Dakota T/A April 2017 - May 2017
MAR 2017 – MAR 2017
Client: P66 Refinery Plant, Sweeny, Texas.
P66 Refinery Plant, Sweeny, Texas. T/A March 2017
JUN 2015 – JUL 2015
Client: HollyFrontier Refinery, Salt Lake, Utah.
HollyFrontier Refinery, Salt Lake, Utah. T/A June 2015 – July 2015
MAR 2014 – APR 2014
Client: Phillip 66 Belle Chasse, Louisiana
Phillip 66 Belle Chasse, Louisiana T/A March – April 2014
JUN 2023 – JUN 2023
Client: Lyondell basell Bay City, TX.
Lyondell basell Bay City, TX. June 2023
JAN 2017 – FEB 2017
Client: Pasadena Refining System Inc. Pasadena, TX.
Pasadena Refining System Inc. Pasadena, TX. T/A January 2017 –Feb. 2017
AUG 2022 – AUG 2022
Client: P66 Refinery Plant, Ferndale, WA
P66 Refinery Plant, Ferndale, WA (FCC, Reformer and Crude units TA Aug 2022)
MAR 2022 – MAR 2022
Client: CVR Wynnewood, OK.
CVR Wynnewood, OK. (Crude and Vac units TA March 2022)
MAR 2019 – APR 2019
Client: ExxonMobil Plant, Beaumont, Texas.
ExxonMobil Plant, Beaumont, Texas. (BPEX, Project) March 2019 – Apr. 2019
Product: Vessels, piping, flanges, and control valves
2019 – 2019
Client: CITGO Plant. Sulphur, LA.
CITGO Plant. Sulphur, LA. (Unicracker unit TA 2019)
2017 – FEB 2019
Client: LQF and PTF FLNG Plant, Freeport, Texas.
LQF and PTF FLNG Plant, Freeport, Texas. (New Const. Project) 2017 – Feb, 2019
Product: Control valves, pressure vessels, piping systems, compressor generators
JUL 2022 – JUL 2022
Client: OCI chemical Plant, Beaumont, TX.
OCI chemical Plant, Beaumont, TX. (Methanol unit TA. July, 2022)
MAY 2022 – MAY 2022
Client: Indorama Petrochemical. Port Arthur, TX
Indorama Petrochemical. Port Arthur, TX (T & I unit TA May 2022)
JAN 2022 – JAN 2022
Client: Valero Refinery, Port Arthur, TX.
Valero Refinery, Port Arthur, TX. (SRU units TA Jan. 2022)
JAN 2020 – MAR 2020
Client: Indorama Petrochemical. Port Arthur, TX
Indorama Petrochemical. Port Arthur, TX (T & I unit TA Jan.- March 2020)
Client: Valero Refinery, Corpus Christi, TX.
Valero Refinery, Corpus Christi, TX. (SRU and AMIE units TA)
JUL 2021 – JUL 2021
Client: Western Midstream Gas Plant. North Reeves County, Odesa, TX.
Western Midstream Gas Plant. North Reeves County, Odesa, TX. (July 2021)
Product: Pressure vessels
JAN 2021 – APR 2021
Client: Enterprise Gas Plant Mount Belview, Baytown. TX.; Covestro chemical Plant, Baytown, TX.
Enterprise Gas Plant Mount Belview, Baytown. TX. T/A Jan –Feb. 2021; Covestro chemical Plant, Baytown, TX. MR-1 unit T/A March – April 2021.
OCT 2020 – NOV 2020
Client: Kinder Morgan Plant, South Sheridan, TX
Kinder Morgan Plant, South Sheridan, TX. Oct. – Nov. 2020
Product: Pressure vessels
DEC 2019 – DEC 2019
Client: Kinder Morgan Plant, Montague, TX.
Kinder Morgan Plant, Montague, TX. Dec. 11, 2019
Product: Pressure vessels
APR 2020 – APR 2020
Client: Dow Petrochem Plant, Laporte TX.
Dow Petrochem Plant, Laporte TX.
MAY 2019 – JUL 2019
Client: PHRC Rehabilitation Project, FCCU, Port Harcourt, Nigeria
PHRC Rehabilitation Project, FCCU (Port Harcourt, Nigeria May 2019- July 2019)
Product: FCCU structure, regenerator, cyclones, reactors, piping, pressure vessels
Standards: API 510 and API 570
Location: Port Harcourt, Nigeria
AUG 2017 – SEP 2017
Client: Calcasieu Refining Co. Lake Charles, LA.
Calcasieu Refining Co. Lake Charles, LA. T/A August – Sept. 2017
JUL 2016 – SEP 2016
Client: Indorama Chemical Plant, Sulphur. LA.
Indorama Chemical Plant, Sulphur. LA. Revamp Project. July – Sept. 2016
FEB 2016 – MAR 2016
Client: Chevron Philips Refinery, Pascagoula. Mississippi.
Chevron Philips Refinery, Pascagoula. Mississippi. T/A Feb – March. 2016
OCT 2015 – NOV 2015
Client: Coffeyville Refinery Energy, Coffeyville. Kansas.
Coffeyville Refinery Energy, Coffeyville. Kansas. T/A Oct – Nov. 2015
MAY 2015 – MAY 2015
Client: Axiall Corporation Chemical Plant, La Porte. TX.
Axiall Corporation Chemical Plant, La Porte. TX. May 2015
APR 2015 – APR 2015
Client: Dow Chemical Plant, Saint Charles, LA.
Dow Chemical Plant, (Olefin unit 1) Saint Charles, LA. April 2015
JAN 2015 – MAR 2015
Client: Valero Refinery plant, Texas City, Texas.
Valero Refinery plant, Texas City, Texas. T/A January 2015- March 2015
JUL 2014 – JAN 2015
Client: Valero Refinery plant, Texas City, Texas.
Naphtha project (New construction MDHT unit) from July 2014 – January 2015
APR 2014 – MAY 2014
Client: BG Tunisia Gas Plant, Sfax in Tunisia North Africa
BG Tunisia Gas Plant, Sfax in Tunisia North Africa (April 28 – May 30, 2014)
Location: Sfax, Tunisia North Africa

Skills

Commodities