Fulkrum — Standardized CV (PoC)

John W. Richards

Summary

John W. Richards is an experienced mechanical, instrumentation and project professional with extensive experience across oil and gas, petrochemical, electrical and instrumentation projects. His inspection and expediting scope includes mechanical skid assemblies, flow measuring equipment, control valves, piping, electrical and instrumentation equipment, control panels, vapour recovery units, flare and burner systems, and sampling systems. He has performed visual and dimensional inspections, testing verification, painting checks, documentation review, construction and fabrication surveillance, and inspection and test plan reviews. His project engineering background covers cost control, scheduling, procurement, document coordination, commissioning, start-up, customer liaison and subcontractor management. He has also prepared instrument schedules and design documentation from P&IDs, coordinated designers, and worked with DCS, PLC, loop testing, as-built documentation and 3D plant design systems.

summary may omit high-priority source evidence: Responsible for HSE and quality implementation and certification for an electrical instrumentation company specialising in ATEX / IECEx installation.

Education

Qualifications and Training

Work Experience

Dec 2017 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Dec 2017 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Apr 2017 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2013 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2012 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2012 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2011 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2010 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Oct 2010 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Nov 2009 – Present FREELANCE (Various clients)
⚠ Review: dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients); dates overlap with FREELANCE (Various clients)
Feb 2000 – Apr 2009 EMERSON PROCESS MANAGEMENT
Project Manager
Jun 1999 – Jan 2000 FLUOR DANIEL
Instrument Design/Engineer
Jan 1999 – May 1999 STANDARD-FASEL LENTJES
Instrument Engineer
Jun 1998 – Oct 1998 CONTROLEC ENGINEERING BV.
Instrument Engineer
⚠ Review: employer contains possible agency name 'BV' — review
Jan 1998 – May 1998 TPI AGENCY
Instrument Engineer
Jun 1994 – Dec 1997 JOHN ZINK BENELUX
Project Engineer/Manager
Feb 1994 – May 1994 FLUOR DANIEL BV
Instrument Design Engineer
⚠ Review: employer contains possible agency name 'BV' — review
Apr 1988 – Sep 1993 DOW EUROPE BV
Instrument Design Engineer
⚠ Review: dates overlap with JOHN BROWN BV; employer contains possible agency name 'BV' — review
Jan 1986 – May 1988 JOHN BROWN BV
Senior instrument designer/co-ordinator
⚠ Review: dates overlap with DOW EUROPE BV; employer contains possible agency name 'BV' — review
May 1985 – Dec 1985 PT TRIPATRA ENG.
Instrument design co-ordinator
Jan 1982 – Apr 1985 JOHN BROWN BV
Senior instrument designer/checker
⚠ Review: employer contains possible agency name 'BV' — review
1981 – 1982 PROTECH INTERNATIONAL BV
Senior instrument designer
⚠ Review: employer contains possible agency name 'BV' — review
1980 – 1981 PENZOIL NEDERLAND BV
Senior instrument designer
⚠ Review: employer contains possible agency name 'BV' — review
1979 – 1980 JOHN MC. NALLY’S & ASS.
Instrument designer
1973 – 1979 PROJECT ENG.SERVICES BV
Electrical/instrument designer
⚠ Review: employer contains possible agency name 'BV' — review
1972 – 1973 KING WILKINSON BV
Electrical designer/draughtsman
⚠ Review: employer contains possible agency name 'BV' — review
1971 – 1972 IMPERIAL CHEMICAL INDUSTRIES
Electrical draughtsman
1966 – 1971 TPI AGENCY
Trainee electrical draughtsman

Projects

JUN 1994 – DEC 1997
Client: NAM-Slochteren
Supply and installation of flare tip and automatic Flame Front Generator Panel
Product: Flare tip and automatic Flame Front Generator Panel
Position: Project Engineer/Manager
JUN 1994 – DEC 1997
Client: NAM-Botlek; NAM-Pernis-West; NAM-Barendrecht
Supply and installation of several ground flare packages completely controlled by PLC (Turn-key project)
Product: Ground flare packages
Position: Project Engineer/Manager
JUN 1994 – DEC 1997
Client: Quatar Liquified Gas Company
Supply of incinerator burners complete with plenums for Amsterdam Chiyoda Company Japan
Product: Incinerator burners and plenums
Position: Project Engineer/Manager
JUN 1994 – DEC 1997
Client: Agip
Supply and installation of complete Vapour Recovery Units in different parts of Europe (Finland, Greece, Italy)
Product: Vapour Recovery Units
Position: Project Engineer/Manager
Location: Finland, Greece and Italy
JUN 1994 – DEC 1997
Client: Amoco
Supply and installation of flare tip for Off-shore Production Platform P/15-C
Product: Flare tip
Position: Project Engineer/Manager
Location: Off-shore Production Platform P/15-C
APR 1988 – SEP 1993
Latex plant
Product: Instrumentation and plant equipment
Position: Instrument Design Engineer
Location: Hamina, Finland
APR 1988 – SEP 1993
By-prod. Utilazation plant
Product: Instrumentation and plant equipment
Position: Instrument Design Engineer
Location: Stade, W-Germany
APR 1988 – SEP 1993
Bisphenol/Epoxy plant
Product: Instrumentation and plant equipment
Position: Instrument Design Engineer
Location: Stade, W-Germany
APR 1988 – SEP 1993
Latex plant
Product: Instrumentation and plant equipment
Position: Instrument Design Engineer
Location: Rheinmuenster, W-Germany
APR 1988 – SEP 1993
Polymer plant
Product: Instrumentation and plant equipment
Position: Instrument Design Engineer
Location: Fort Saskatchewan, Canada
JAN 1999 – MAY 1999
Client: Bridge Water Paper UK project by Kvaerner UK
Bridge Water Paper UK project
Product: Boiler instrumentation
Position: Instrument Engineer
OCT 1998 – OCT 1998
Client: Shell Chemie
Plant Units Revamp
Product: Instrumentation and construction packages
Position: Instrument Engineer
JAN 1998 – MAY 1998
Client: Arco Chemie
Plant changes
Product: Instrumentation and construction packages
Position: Instrument Engineer
JUN 1999 – JAN 2000
Client: DuPont de Nemours
Construction packages for Plant engineering
Product: Instrumentation and construction packages
Position: Instrument Design/Engineer
Location: Dordrecht, Netherlands
FEB 2000 – APR 2009
Custody Transfer Metering projects
Product: Custody Transfer Metering systems
Position: Project Manager
FEB 2000 – APR 2009
Multi-Phase Metering Systems
Product: Multi-Phase Metering Systems
Position: Project Manager
JAN 1986 – MAY 1988
Client: Du-Pont Nemours
Tyvek plant
Product: Instrumentation and automatic loop diagram systems
Position: Senior instrument designer/co-ordinator
Location: Luxembourg
MAY 1985 – DEC 1985
Client: ARCO
Oil and gas production off-shore facilities
Product: Instrumentation and offshore facilities
Position: Instrument design co-ordinator
JAN 1982 – APR 1985
Client: Aramco
Aramco projects
Product: Instrumentation
Position: Senior instrument designer/checker
Location: Saudi Arabia

Languages

Skills

Commodities