Matthew James Chapman is a highly experienced Vendor Inspection and Verification Engineer with 30+ years of engineering and inspection experience across oil & gas and energy-sector projects. He provides electrical and mechanical inspection surveillance, FAT and integration-test witnessing, documentation review, QA/QC assurance and final release certification for motors, control panels, hazardous-area equipment, subsea electrical systems, instrumentation, valves, pumps, rotating equipment and pressure systems. His capabilities include electrical and mechanical FAT, valve inspection, ITP and drawing review, inspection reporting, quality dossier review and release recommendation. He has led independent inspection and verification services, managed inspectors and international resources, supported client and EPC interfaces, and delivered technical assurance across mechanical, electrical, structural, pressure and subsea equipment for major operators including TotalEnergies and Wintershall.
| End Client / Project | Vendor | Equipment | Inspection Scope | |
|---|---|---|---|---|
| TOTAL Energies | Gall Thomson | Breakaway systems | FAT / final inspection | |
| PDM&S | Corinj | Pressure equipment / Chemical Injection | Pressure test / final inspection | |
| Total Energies | ExHeat | HP Flare Drum Heater c/w Heating Element Bundle | Hydro./Electrical/ Final Inspections | |
| Baker Hughes | Aquaterra Energy | Offshore equipment – spools, valves and drilling equipment | Final / load-out inspection | |
| Delta Pacific Valves (DPV-UK) | DPV-UK | Various valves | Pressure testing | |
| MODEC | Amarinth | Pump packages | Final dimensional inspection, packing and document review | |
| KANFA Group | Amarinth | Pump packages | FAT / final dimensional inspection, packing and document review | |
| QatarEnergy LNG | JDR | Umbilical system | FAT / pressure testing | |
| KBR | ADANAC | Various valves | Hydrostatic testing / FAT | |
| Metlen Energy & Metals S.A. | ADANAC | Valve packages | Pressure test / final inspection | |
| Arabian Industries Middle East | Amarinth | Pump packages | FAT / final dimensional inspection, packing and document review | |
| ADNOC | Amarinth | Pump packages | FAT / final dimensional inspection, packing and document review | |
| Exxon | Gall Thomson | Marine transfer / breakaway equipment | FAT / final inspection | |
| TOTAL Energies | Petrotech | Controller for Fire Water Pump Package | FAT/ FInal | |
| Year | Client / Project | Vendor / Facility | Equipment / Commodity | Representative Scope |
| 2012-13 | GDF Suez | Proserv / project vendors | HPU, EPU, SCM, SCMMB, SDU, TUTU, SAM / subsea controls | Extended vendor surveillance; kick-off/ITP activity; FAT and integration/test witnessing; documentation, concession and punch-list review; inspection reporting and release. |
| 2012 | Chevron | Proserv | Subsea control / packaged equipment | Inspection and test witnessing supported by client test documentation; documentation review, inspection reporting and release activities. |
| 2014 | BP project | Weatherford | Rapid connector / oilfield equipment | Vendor inspection, documentation review and inspection release across multiple visits / phases. |
| 2013 | Aquaterra Energy | Morgan Cooper | Rotating / mechanical equipment | Vendor inspection against Aquaterra scope; document review, follow-up visit and final inspection release. |
| 2013 | TEPI / Total | Gall Thomson | Marine transfer / coupling equipment | Vendor inspection and release activity against project notification / purchase order. |
| 2013 | Centrica / project work | TATA Great Yarmouth | Process / fabricated equipment | Inspection visits and final inspection release; associated project documentation review. |
| 2012 | Subsea project | SPS Great Yarmouth | Concrete fleximats / subsea protection | ITP surveillance, certification review, final inspection and inspection release. |
| 2012 | Centrica project | KSD Engineering | Fabricated / mechanical equipment | Final inspection checklist, document review, inspection reporting and release note. |
| 2013 | Claxton scope | BFS Beccles | Subsea / oilfield equipment | Inspection to defined Claxton scope, documentation review and final release. |
| 2013 | Project assignment | GE Great Yarmouth | Electrical / mechanical packaged equipment | Multi-visit inspection surveillance, reporting and final inspection release. |
| Year | Client / Project | Vendor / Facility | Equipment / Commodity | Representative Scope |
| 2013-15 | Various Oil & Gas clients | Halliburton | Baskets, containers, tanks, gas racks / oilfield equipment | Repeated final inspections, cargo summary checks, certification review and inspection release. |
| 2013 | Various | Schlumberger, Great Yarmouth | Wireline valves / slickline equipment | Witnessed wireline valve pressure and functional testing; inspection reporting and release. |
| 2014-15 | Various | NOV | Drilling / oilfield and cargo equipment | Repeated vendor inspections, cargo/checklist verification, certification review and inspection release. |
| 2013-15 | Centrica / various | ASCO | Lifting, transport and offshore cargo equipment | Inspection, manifest/certification checks, cargo summary verification and release. |
| 2013-15 | Various | Coates Offshore | Offshore equipment, steam generator, diesel engines | Final inspection, equipment-specific checklist review, certification verification and release. |
| 2015 | Various | Certex | Lifting / offshore cargo equipment | Inspection, cargo checklist and certification review, final release. |
| 2015 | Various | Steel Services | Structural / fabricated and lifting equipment | Inspection, NDE and lifting certification review, cargo verification and release. |
| 2011-15 | Various | Weatherford | Subsea / oilfield equipment | Vendor inspection, certification and cargo checks, final release across repeated assignments. |
| 2011-15 | Various | Baker Hughes, Great Yarmouth | Subsea / oilfield service equipment | QA/QC inspection, testing/documentation review and release activities. |
| 2011-15 | Various | Claxton, Great Yarmouth | Subsea drilling, riser and intervention equipment | Vendor surveillance, inspection/test witnessing, certification review and release. |
| 2011-15 | Various | Aquaterra Energy | Riser / offshore and subsea equipment | Mechanical inspection, documentation/certification review and release. |
| 2011-15 | Various | CAP Fabrications | Fabricated structures / offshore equipment | Fabrication inspection, dimensional/final checks and load-test related inspection. |
| 2011-15 | Various | Simmons Edeco | Diesel engines / oilfield equipment | Equipment inspection, functional/final checks and documentation review. |
| 2011-15 | Various | Bilfinger Salamis / SLP | Offshore structural / fabricated equipment | Fabrication surveillance, QA/QC inspection and documentation review. |
| 2011-15 | Various | Tyco / DSL / GE | Electrical and control equipment | Electrical/mechanical inspection, functional verification, documentation review and final release. |
| 2011-15 | Various | Alicat / Scantech / Probe Tools | Instrumentation / measurement equipment | Inspection, functional/testing verification and documentation review. |
| Year | Client / Project | Vendor / Facility | Equipment / Commodity | Representative Scope |
| 2016 | BP project | Hi-Tech Products, Rackheath | Pipe / material products | Inspection against purchasing specification; inspection reporting, identification/document review and NCR process where applicable. |
| 2017 | Erin Energy | Tyco / ILS | Offshore lifting equipment | Witnessed load testing against approved procedures; load-cell/sling certification review and inspection reporting. |
| 2017 | Etha North | SMS, Great Yarmouth | HPU / packaged subsea equipment | Vendor inspection and test surveillance including load/functional activities and QA documentation review. |
| 2017-18 | Alder | Proserv / SMS | Subsea control / HPU equipment | FAT and test surveillance, pressure/cleanliness-related verification, documentation review and punch-list/final inspection activity. |
| 2017-18 | Stampede | Proserv | Subsea control equipment | Inspection notifications, FAT/hyperbaric test surveillance, documentation review and inspection reporting. |
| 2019 | Caesar Tonga | Constellation | Electrical / subsea equipment | Multi-visit client inspection/FAT activity including electrical verification and formal inspection reporting. |
| Historic | Tubular Bells | Weatherford, Great Yarmouth | SCM / subsea controls | Inspection and test surveillance, photographic records, documentation review and formal reporting. |