Fulkrum — Standardized CV (PoC)

NGUYEN VAN LAM

Summary

Nguyen Van Lam is a Senior QA/QC, Welding, NDT and Coating professional with more than 24 years of experience across offshore and onshore oil and gas, refinery, offshore wind, pressure-vessel, WHRU, subsea and heavy-fabrication projects. He specializes in third-party inspection, site representation, vendor surveillance and expediting, NDT coordination, welding and coating inspection, QA systems, and final documentation review. His scope includes critical assets such as wellhead platforms, jackets, pressure vessels, boilers, piping, structural steel, heat exchangers, chemical injection skids, WHRU, subsea packages and wind-farm structures. He has managed QC teams, prepared ITPs, WPSs, PQRs and audit documentation, and supported international clients including Saipem, McDermott, Samsung Engineering, DNV and Subsea 7. He has strong working knowledge of major ASME, AWS, API, DNV, ASTM, BS EN, ISO, JIS, EEMUA and TEMA requirements.

Education

Qualifications and Training

PCN Level 2 - Ultrasonic TestingSep 2024PCN No. 305966Certificate No. F246242EOV01L
FROSIO Coating Inspector Level IIIAug 2024FROSIO ID 16996Certificate No. 14447
PCN Level 2 - Radiographic InterpretationMay 2024PCN No. 305966Certificate No. FVR246342YOU0
CSWIP 3.2 Senior Welding Inspector – TWI UK2023Certificate No. 358989/2

Work Experience

Feb 2026 – Aug TPI AGENCY
Inspector on Behalf of Saipem
⚠ Review: end date missing or unclear; employer replaced on AI judgment alone — verify agency status
Nov 2025 – Jan 2026 CNI
Welding, NDT & Coating Inspector
Feb 2025 – Nov 2025 RUYA NOC
Welding, NDT, Coating & Installation Inspector
Nov 2024 – Jan 2025 Bason Yard
NDT Coordinator
Apr 2024 – Sep 2024 TPI AGENCY
Third-Party Inspector
⚠ Review: dates overlap with PVC-MS Yard; employer replaced on AI judgment alone — verify agency status
Nov 2023 – May 2024 PVC-MS Yard
QA/QC Structural Inspector
⚠ Review: dates overlap with Alpha-ECC
May 2023 – Oct 2023 TPI AGENCY
On-Call Third-Party Inspector
Nov 2022 – Apr 2023 TPI AGENCY
QC Inspector
⚠ Review: employer replaced on AI judgment alone — verify agency status
Oct 2021 – Oct 2022 WASCO
QC Inspector
Apr 2020 – Sep 2021 Samsung Engineering
Piping / Welding Inspector
Jan 2019 – Feb 2020 Etec E&C
Pressure Vessel & Boiler Inspector
May 2018 – Jan 2019 POS / Huynhdai
Piping / Welding Inspector
Jan 2018 – Mar 2018 NSRP
Radiographic Interpretation Inspector
Jun 2017 – Dec 2017 POSCO E&C
Supervising Engineer
May 2016 – Mar 2017 JGCS Consortium
Piping / Welding Inspector
Feb 2016 – May 2016 CSWind Vietnam
Structural Inspector
Aug 2015 – Jan 2016 Shelf Drilling
Supervisor
May 2014 – Jul 2015 PetroVietnam Technical Services Corporation (PTSC)
QA/QC Inspector
Sep 2009 – Apr 2014 PetroVietnam Marine Shipyard (PVMS)
Welding Inspector
⚠ Review: dates overlap with Leighton Asia
Apr 2012 – Sep 2012 Leighton Asia
QC Inspector
⚠ Review: dates overlap with PetroVietnam Marine Shipyard (PVMS)
Sep 2002 – Sep 2009 TPI AGENCY
NDT Technician

Core Competencies

Projects

FEB 2026 – AUG
Client: Saipem
Indonesia Kutei North Hub Project
Vendor: Alpha-ECC
Product: WHRU
Standards: ASME Section VIII, Division 1
Position: Inspector on Behalf of Saipem
NOV 2025 – JAN 2026
AI Waha DBN
Vendor: CNI
Product: Pressure vessels
Standards: ASME Section VIII, Division 1
Position: Welding, NDT & Coating Inspector
Location: Nhon Trach, Dong Nai
FEB 2025 – NOV 2025
Client: NOC
RUYA NOC
Product: Chemical injection and air instrument package
Position: Welding, NDT, Coating & Installation Inspector
NOV 2024 – JAN 2025
Phu Quoc POC - Lo B Jacket Project
Vendor: Bason Yard
Product: Jacket
Position: NDT Coordinator
APR 2024 – SEP 2024
Quiluma & Maboqueiro (Q&M) Project - WHRU
Vendor: Alpha-ECC
Product: WHRU
Position: Third-Party Inspector
Location: Yard 5, Dong Xuyen Industrial Zone
NOV 2023 – MAY 2024
Client: Osted
Changhua Offshore Wind Farm CHW2204
Vendor: PVC-MS Yard
Product: Wind-farm structures
Position: QA/QC Structural Inspector
Location: Vung Tau
MAY 2023 – OCT 2023
Client: Ponticelli
DBN PWM & AB OBS (NOC)
Position: On-Call Third-Party Inspector on Behalf of DNV
Location: PTSC, Vung Tau
NOV 2022 – APR 2023
Client: Santos Australia Pty Ltd
Barossa Project
Vendor: Fulkrum / Subsea 7
Product: FLETs, wet-buckle assemblies, pig launchers, pig receivers and catenary wet-buckle dewatering heads
Standards: Quality Plan and ITP
Position: QC Inspector
Location: PTSC-POS, Vung Tau
OCT 2021 – OCT 2022
Client: INEOS
New Energy Plant
Vendor: WASCO
Product: Plates, pipes, bars, forgings and bought-out items
Position: QC Inspector
Location: ATAD, Dong Nai
APR 2020 – SEP 2021
Long Son Refinery Project
Vendor: Samsung Engineering
Product: Piping
Position: Piping / Welding Inspector
Location: Vung Tau
JAN 2019 – FEB 2020
Hyosung Chemical Project
Vendor: Etec E&C
Product: Pressure vessels, boilers and shell-and-tube heat exchangers
Standards: ASME Section VIII, Division 1; TEMA
Position: Pressure Vessel & Boiler Inspector
Location: CNI Factory, Dong Nai
MAY 2018 – JAN 2019
NARS Wellhead Platform Offshore Modification
Vendor: POS / Huynhdai
Product: Wellhead platform
Position: Piping / Welding Inspector
Location: Abu Dhabi Offshore
JAN 2018 – MAR 2018
Nghi Son Refinery Project
Vendor: NSRP
Position: Radiographic Interpretation Inspector
Location: Thanh Hoa, Vietnam
JUN 2017 – DEC 2017
DANGOTE Header Heater Fabrication
Vendor: POSCO E&C
Product: Header heaters
Position: Supervising Engineer
Location: Nhon Trach, Dong Nai
MAY 2016 – MAR 2017
Nghi Son Refinery
Vendor: JGCS Consortium
Product: Piping
Position: Piping / Welding Inspector
Location: Thanh Hoa, Vietnam
FEB 2016 – MAY 2016
Nobel Wind Project
Vendor: CSWind Vietnam
Product: Wind-turbine structures
Position: Structural Inspector
Location: Phu My, Ba Ria-Vung Tau
AUG 2015 – JAN 2016
Galveston Key & Trident 9 Jack-Up Rig Repair and Modification
Vendor: Shelf Drilling
Product: Jack-up rigs
Position: Supervisor
Location: Bahrain
MAY 2014 – JUL 2015
Marahaja Lela South Project
Vendor: PetroVietnam Technical Services Corporation (PTSC)
Product: Topside, jacket and pile fabrication
Position: QA/QC Inspector
Location: Vung Tau
SEP 2009 – APR 2014
Tam Dao 3 jack-up rig; E320 lift-boat leg fabrication and erection; PVD-III drilling-rig repair; Tam Dao 5 jack-up rig
Vendor: PetroVietnam Marine Shipyard (PVMS)
Product: Jack-up rigs, lift-boat legs and drilling rigs
Position: Welding Inspector
Location: Vung Tau
APR 2012 – SEP 2012
Ichthys Project
Vendor: Leighton Asia
Position: QC Inspector
Location: Phu My, Ba Ria-Vung Tau
SEP 2002 – SEP 2009
C1 and CLPP wellhead platforms; Rang Dong field development topside and jacket; RUBI-A and RUBI-B wellhead platforms; CLPP process module Phase 2; Nam Con Son plant maintenance and Phase 2; Bunga Tulip A; Su Tu Vang flare boom; Dinh Co turnaround; Talisman wellhead platform; ship and FPSO repair and modification
Vendor: Alpha-Inspection (NDT)
Product: Wellhead platforms, topsides, jackets, process modules, ships and FPSOs
Position: NDT Technician
Location: Offshore and Onshore, Vung Tau

Languages

Skills

Commodities