Summary
Stephen Chen has 15 years of QC experience across pressure vessels, piping, fittings, valves, steel structures, port cranes, ship hulls, modules, trains and railway equipment for Oil & Gas, Chemical and Logistic industries. He has performed raw-material and mechanical-property verification, material traceability, WPS/PQR and welding checks, NDE, pressure testing, dimensional inspection, coating and pickling inspection, document review, packing and marking inspection, and PSI activities. As a QA/QC Inspector and Expeditor, he has managed vendor inspections, production follow-up, schedule coordination, client reporting and delay-risk mitigation. His project scope includes subsea connectors, pressure vessels, heat exchangers, skids, composite piping, castings and major steel structures, supported by detailed quality-document and manufacturing-process review.
Education
- 2004~2008 University: Jiangsu Science and Technology University
Qualifications and Training
- 2013: Training for CWI
- 2017: Training for RT / UT / MT / PT level II
- CWI Certificate
- ASNT RT level 2 certificate
- ASNT UT level 2 certificate
- ASNT MT level 2 certificate
- ASNT PT level 2 certificate
Previous Fulkrum Work Experience
| Year | Scope Vendor | Scope Type | Material Description |
|---|
| 2026 | Fiber Glass Systems (Qingdao) Composite Piping Co.,Ltd | Inspection | Bondstrand GRE pre-fabricated spools: 7000M & 7000M-L series |
| 2025 | Shenyang Yongye Industry Co. Ltd., | Inspection | Sea Water Lift Pump Flexible Intake Pipes |
| 2025 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | Sea Water Vacuum Tower |
| 2025 | Qingdao Zhongyan Anti-Corrosion Tchnology Co.,Ltd. | Inspection | Structures and Auxillary Structures |
| 2024 | Qingdao NPA Industry Co.Ltd | Inspection | Catalyst Tubes |
| 2024 | Shandong Guoshun Construction Group Co. Ltd . | Inspection | Ship Loader Conveyor Steel Structure |
| 2023 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | Pig Traps, Pressure Vessels |
| 2022 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | Sea Water Treatment Package |
| 2022 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | Gas Dehydration Unit and TEG Regeneration |
| 2022 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | HS2 Removal and Amine Regeneration |
| 2022 | Himile Mechanical Manufacturing Co. Ltd. | Inspection | Pressure Vessels and Shell & Tube Heat Exchangers |
Codes & Standards
- AWS
- ASME
- ASTM
- API
- GB
- HB
- JB
- EN
- ISO
Work Experience
Jul 2015 – Present
TPI AGENCY
QA/QC Inspector
- Performed various inspections and expediting activities at vendor facilities during manufacture, fabrication and operational testing.
- Verified vendor compliance with purchase orders and specifications.
- Performed inspection and expediting across pipes, fittings, valves, pressure vessels, skids, heat exchangers, steel structures, castings and railway equipment.
- Reviewed inspection records, quality documents and manufacturing status and reported project progress to clients.
Apr 2013 – Apr 2015
TPI AGENCY
QA/QC Inspector
- Performed various inspections and expediting activities at vendor facilities during manufacture, fabrication and operational testing.
- Verified vendor compliance with purchase orders and specifications.
- Issued and reviewed inspection reports and records and monitored project status and quality documentation.
- Performed vendor inspection for train bodies, train parts, port cranes, offshore-platform cranes, building steel structures and rig equipment.
Aug 2008 – Mar 2013
Shanghai COSCO Zhoushan Shipyard
QC Engineer
- Arranged daily inspections according to monthly and weekly plans and the production schedule.
- Followed up inspections and supervised subcontractors in addressing inspection NCRs and punch lists.
- Collected inspection information and provided feedback to leadership and related departments.
- Communicated with ship owners and classification organizations to resolve quality problems and improve first-pass inspection results.
- Coordinated with the design department on design modifications identified by ship owners.
- Monitored NDE statistics for welding defect rates and welder performance.
- Issued memos and NCRs, monitored corrective actions and closed out memos and NCRs.
- Attended weekly QC meetings with contractors and clients.
- Reviewed and signed inspection reports and records and maintained quality documents.
- Worked on 57000/82000 DWT cargo ships, a 60M barge-carrying ship, PSV projects and FPSO offshore projects.
Projects
ERW & SSAW Pipe Project
Vendor: Tianjin Xinyue Steel Pipe Co., Ltd
Product: Pipes
Position: Inspection Engineer
- Conducted the pre-inspection meeting.
- Reviewed steel coil material MTCs and checked steel coils.
- Witnessed steel coil sampling, sample machining, ageing treatment, chemical analysis and mechanical testing.
- Witnessed forming and welding.
- Witnessed PWHT, metallurgy and macrographic testing.
- Witnessed finished-pipe sampling, sample machining, ageing treatment and mechanical testing.
- Witnessed flattening, automatic UT and manual UT.
- Performed final visual and dimensional inspection, marking checks and document review.
PETRO CHAD (MANGARA) PROJECT
Vendor: Cangzhou Dalip Petroleum Special Pipeline Co., Ltd.
Product: SMLS pipe
Standards: API 5L
- Witnessed chemical and mechanical tests.
- Witnessed hydro-testing.
- Witnessed NDT and reviewed NDT reports.
- Performed visual and dimensional inspection.
- Inspected packing, marking and loading.
- Reviewed quality documents.
Client: CUNADO S.A
Vendor: Shenyang UNIWEL Pipe Fitting
Product: Fittings and flanges
Standards: ASME B16.5, B16.9, B16.11 and Client Specification
- Performed raw-material receiving inspection.
- Witnessed heat treatment, laboratory testing, NDE and PMI.
- Performed visual and dimensional inspection.
- Inspected painting and packing.
- Performed final document review.
900KTPA AMIN Captive Copper Smelter Project
Vendor: Cangzhou longtaidi pipe technology Co., Ltd
Product: Pipe fittings
- Reviewed procedure documents and studied the product production process.
- Prepared the pipe-fittings production schedule for hot forming, heat treatment, blasting, painting and packing with the vendor against the purchase-order schedule.
- Checked raw-material delivery status and followed up procurement delays.
- Supervised each production process against the agreed schedule and provided daily feedback to the client.
- Followed up the vendor to complete as-built documents on time.
Client: CNOOD
Iran Missan Oil Field
Vendor: Zhangjiagang LBT Engineering Company
Product: Pipe spools
Position: Pipe spool inspector
- Performed resident inspection for pipe-spool prefabrication.
- Reviewed quality certificates for carbon-steel pipe, stainless-steel pipe, flanges, bolts, nuts, spacers, valves and steel structures.
- Reviewed RT/PT reports, WPS/PQRs, welder and NDT personnel qualifications, pressure-gauge calibration certificates, PWHT records and hydrostatic-test procedures.
- Supervised pipe, fitting and flange assembly and welding, and reviewed RT films.
- Checked dimensions against isometric drawings and witnessed pipe-spool hydro-testing.
- Inspected pickling and passivation of stainless-steel spools.
- Inspected painting quality of carbon-steel spools, packing and marking.
Client: Arabi Enertech
Construction of Flowlines and associated works in North Kuwait Area
Vendor: Jiangsu Huaying Valves Co., Ltd.
Product: Gate/globe/check valves and ball valves
Standards: API 609, API 598, API 594, API 600, API 602, API 607, API613, ASME B 16.10, ASME B 16.34, technical protocol and mill internal specifications
- Reviewed material test reports and performed dimensional and visual inspection.
- Reviewed and witnessed NDE and performed PMI testing of stainless/alloy materials.
- Witnessed operation, backseat, closure, shell and low-pressure closure tests.
- Inspected rust prevention, painting and shipping preparation.
Client: Arabi Enertech
Construction of Flow lines & Associated Works in West Kuwait Area
Vendor: Sanbora Valve Co., Ltd.
Product: Gate/globe/check valves
Standards: API 609, API 598, API 594, API 600, API 602, API 607, API613, ASME B 16.10, ASME B 16.34, technical protocol and mill internal specifications
- Reviewed material test reports and performed dimensional and visual inspection.
- Reviewed and witnessed NDE and performed PMI testing of stainless/alloy materials.
- Witnessed operation, backseat, closure, shell and low-pressure closure tests.
- Inspected rust prevention, painting and shipping preparation.
Client: China Nuclear Industry Fifth Construction Co., Ltd
Natural Gas Purification Project of Sinopec Southwest Oil & Gas Company
Vendor: CNNC Sufa Technology Industry Co., Ltd
Product: Gate/globe/check/butterfly/ball/plug/knife gate valves
Standards: API 609, API 598, API 594, API 600, API 602, API 607, API613, ASME B 16.10, ASME B 16.34, technical protocol and mill internal specifications
- Reviewed material test reports and performed dimensional and visual inspection.
- Reviewed and witnessed NDE and performed PMI testing of stainless/alloy materials.
- Witnessed operation, backseat, closure, shell and low-pressure closure tests.
- Inspected rust prevention, painting and shipping preparation.
Petroleum Development Oman Project
Vendor: Suzhou CNV VALVE Company, Zhejiang Jiuli Stainless Steel Tube Co. Ltd.
Product: Ball Valve, Check Valve, Pipes
- Performed resident inspection for ball valves, check valves and pipes.
- Inspected raw materials, certificates, markings and material traceability.
- Reviewed fabrication documents including ITPs, WPSs, welder qualifications and NDT personnel qualifications.
- Witnessed CS, SS and DSS-UNS S31803 material testing, including tensile, flattening, impact, hardness, corrosion, microstructure, ferrite-content, detrimental-phase, chemical and PMI testing.
- Reviewed welding, hydro-test, air-tight-test and painting procedures.
- Inspected overlay welding and dimensions, reviewed RT films and witnessed MT, hydro, air-tight and FE tests.
- Checked paint appearance and DFT, reviewed and signed inspection records and valve certificates, and witnessed packaging and delivery.
Client: SINOPEC
PRAXAIR safety valves expedite
Vendor: Yizhuang, Beijing Beijing aerospace science and technology
Product: Safety Valves
- Attended valve-expediting meetings with the client and vendor.
- Prepared production schedules with the vendor and checked raw-material delivery status.
- Followed up the production plan and provided daily client feedback.
- Anticipated delay risks and coordinated overtime with production.
- Followed up cast valve bodies and other parts at the sub-vendor plant.
- Worked with the vendor to resolve quality, technology, process and equipment issues affecting production schedules.
Client: KOC
Vendor: Sufa Valve
Product: Ball & Check Valves
- Checked the status of drawings, NDE, pressure testing and surface preparation.
- Witnessed PMI for stainless-steel material, shell testing, high-pressure closure testing, low-pressure air seat leak testing and FE testing.
- Performed visual, dimensional and marking inspection.
- Reviewed 3.1 and 3.2 certificates, PMI reports and FE-test reports.
Qatar Gas COMP2 Project
Vendor: Fiber Glass Systems (Qingdao) Composite Piping Co., Ltd.
Product: GRE pipes, pipe fittings, flange and spool
- Witnessed DSC testing.
- Performed visual, dimensional and marking inspection for GRE pipes, fittings, flanges and spools.
- Checked Barcol hardness, conductivity and hydrostatic testing.
- Inspected topcoat paint visually and reviewed the MRB and release.
Baker Hughes Subsea Connectors & Clamp project
Vendor: Himile Mechanical Manufacturing Co. Ltd.
Product: Subsea connectors and clamps
- Performed fit-up and welding inspection and monitored welding against WPS/PQRs.
- Witnessed NDT and hydrostatic testing.
- Witnessed FAT, including electrical continuity, torque, weighting and loading tests.
- Performed visual and dimensional inspection, nameplate and traceability-marking verification.
- Inspected painting, including surface quality, DFT, colour and XYLAN coating.
- Inspected packing and reviewed SICD/MRB documentation.
SBM-TEG FLASH VESSEL
Vendor: Himile Mechanical Manufacturing Co. Ltd.
Product: Pressure vessel
- Inspected raw materials, MTRs, receipt, cutting, traceability and rolling.
- Performed fit-up and welding inspection, monitoring GTAW, FCAW, SMAW, SAW and overlay welding against WPS/PQRs.
- Witnessed PMI, hardness, NDT, air-tight leak, hydrostatic and weighing tests.
- Inspected internal cleaning, visual and dimensional condition, pickling and passivation.
- Verified nameplates, marking and packing and reviewed the MRB.
ENI-IRAQ ZUBAIR MISHRIF DGS EXPANSION PROJECT
Vendor: Himile Mechanical Manufacturing Co. Ltd.
Product: Test Separator & Sand Removal Package & Heat Exchanger
- Inspected raw materials, MTRs, receipt, cutting, traceability, rolling and shell/nozzle fit-up.
- Performed welding inspection and monitored GTAW, FCAW, SMAW, SAW and overlay welding against WPS/PQRs.
- Witnessed PMI, hardness, PWHT, NDT, air-tight leak, hydrostatic, weighing and skid FAT tests.
- Inspected internal cleaning, visual and dimensional condition, pickling and passivation.
- Verified nameplates, marking and packing and reviewed the MRB.
PETROBRAS-Buzios P79
Vendor: Himile Mechanical Manufacturing Co. Ltd.
Product: Pressure vessel & piping & skid
- Inspected raw materials, MTRs, receipt, cutting, traceability, rolling and shell/nozzle fit-up.
- Performed welding inspection and monitored GTAW, FCAW, SMAW, SAW and overlay welding against WPS/PQRs.
- Witnessed PMI, hardness, PWHT, NDT, air-tight leak, hydrostatic, weighing and skid FAT tests.
- Inspected internal cleaning, visual and dimensional condition, pickling and passivation.
- Verified nameplates, marking and packing and reviewed the MRB.
ExxonMobil Yellowtail Project
Vendor: Himile Mechanical Manufacturing Co. Ltd.
Product: Casting (Fairlead -Gypsy Wheel)
- Monitored casting pouring and recorded pouring temperature.
- Witnessed quenching, tempering, test blocks, stamping, chemical analysis and mechanical-property testing.
- Witnessed VT, MT and UT and recorded defects.
- Monitored defect removal, repair welding and post-repair VT, MT and UT, including PWHT.
- Performed dimensional and visual inspection, final marking inspection and machining-surface MT/UT.
- Inspected preservation and packaging and reviewed the MRB.
New Phosphate Port in the region of Laayoune
Vendor: MCC (Shanghai) Steel Structure Technology
Product: Steel Structure
- Inspected raw materials, MTRs, receipt, steel-plate sampling, retesting, cutting and traceability.
- Performed fit-up, welding, visual, dimensional, heat-straightening and pre-assembly inspection.
- Witnessed NDT and inspected marking and packing.
- Reviewed documents.
Lusail Stadium Steel Structure Project
Vendor: Guangdong Wenchong Shipyard
Product: Steel Structure
- Coordinated production and fabrication and reviewed steel-plate and section MTCs.
- Inspected raw materials, cutting and beveling and controlled fabrication quality risks.
- Monitored assembly and welding and witnessed MT and UT.
- Performed final visual and dimensional inspection and checked blasting and painting.
- Reviewed quality documents and tracked and closed client NCRs.
AP-Jiutai Air Chemical Project
Vendor: Jianglian Heavy & Industrial Group Co., Ltd.
Product: Pressure Vessel
- Reviewed steel-plate MTCs and inspected steel-plate raw material.
- Checked shell-plate cutting, beveling and rolling.
- Monitored shell-segment assembly and welding.
- Witnessed MT, UT, hydrostatic and air-tightness tests.
- Performed final visual and dimensional inspection and reviewed and signed quality documents.
TORTUE HUB / TERMINAL – MARINE & CIVIL WORKS
Vendor: HEFEI ZIKING STEEL PIPE
Product: Sleeve, Cone, Jacket Can Pipes
Position: Resident inspection team leader
- Conducted the pre-inspection meeting and reviewed steel-plate MTCs.
- Inspected raw steel plates and witnessed raw-material and final-pipe sampling, chemical analysis and mechanical testing.
- Witnessed forming, welding, MT and UT.
- Performed final visual and dimensional inspection and marking checks.
- Created production traceability records and reviewed and signed quality documents.
Mono-Ethylene Glycol (MEG) Facility
Vendor: Shuangliang Eco-Energy Systems Co., Ltd
Product: Package Unit-Chilled Water Refrigeration
- Attended chiller expediting meetings and reviewed procedure documents and the product-production process.
- Prepared production schedules and checked raw-material delivery and procurement delays.
- Supervised fabrication and identified quality, manpower, equipment and workload risks affecting schedule.
- Held coordination meetings, reported progress to the client and followed up sub-vendor status.
- Performed ITP-based visual and dimensional inspection and witnessed tightness, hydrostatic and mechanical tests.
- Reviewed and signed quality documentation.
Turbine Booster Aftercooler Project
Vendor: Suzhou API HEAT TRANSFER
Product: Heat Exchanger
- Performed raw-material receiving, visual and dimensional inspection.
- Witnessed shell-side and tube-side hydrostatic testing and leakage testing of shell, tube and tube-to-tube-sheet joints.
- Checked shell and tube sides before assembly and inspected cleanliness and painting.
- Performed NDT, final inspection and completeness checks and reviewed documents.
KOC Pipe fittings
Vendor: Feiting Pipe Manufacture Co., Ltd.
Product: Pipe fittings
- Attended expediting meetings and reviewed procedures and production processes.
- Prepared schedules for hot forming, heat treatment, blasting, painting and packing.
- Checked raw-material delivery and supervised production against schedule.
- Coordinated problem-solving meetings and reported progress to the client.
- Reviewed MTCs, identified the ITP and PO, and performed visual and dimensional inspection of elbows, nipples, reducers, tees, weldolets and couplings.
- Inspected weld profiles, witnessed PMI for F316/316L and UNS S32750 fittings, and reviewed quality documents.
SOPC VIETNAM N2 PROJECT
Vendor: Shuangliang Eco-Energy Systems Co., Ltd.
Product: Gas Cooler
- Performed raw-material receiving, visual and dimensional inspection.
- Witnessed shell-side and tube-side hydrostatic and leakage tests, including tube-to-tube-sheet joints.
- Checked the bundle and shell before assembly and inspected cleanliness and painting.
- Performed NDT, final inspection and completeness checks and reviewed documents.
SHENHUA GUOHUA INDONESIA JAWA COAL FIRED POWER PLANT PROJECT
Vendor: CHINA MCC5 GROUP CORP.LTD
Product: Coal power plant steel structure
- Inspected raw materials and reviewed ITPs, WPSs, welder qualifications and NDT personnel qualifications.
- Performed assembly inspection and witnessed preheating, welding and PWHT and checked records.
- Witnessed UT and PT, drilling and heat straightening.
- Performed visual and dimensional inspection before painting.
- Inspected blasting and painting, including roughness, temperature, humidity, dew point and steel-plate surface temperature.
- Inspected marking and packing and reviewed and signed inspection reports and records.
Molsoncoors PEAK(Canada) Beer Fermentation Storage Tank Project
Vendor: Nantong ZIEMANN HOLVRIEKA Asia Co., Ltd. (CIMC Enric)
Product: Beer Fermentation Storage Tank
- Identified welding and raw materials for carbon-steel and stainless-steel tanks.
- Reviewed ITPs, WPSs, welding maps, welder qualifications, NDT qualifications and welding, hydro-test and insulation procedures.
- Witnessed hydro, pickling and passivation, polishing and PT tests and reviewed RT films and reports.
- Inspected insulation, visual condition, nozzle orientation, dimensions, roughness and cleanliness.
- Checked paint appearance and film thickness, packing and marking, witnessed shipping and reviewed and signed inspection records.
JUN 2017 – OCT 2017
SABIC ZAHR HC/VRC DBN PROJECT
Vendor: Maoming Challenge Petrochemical Machinery Co., LTD.
Product: Heat exchangers and cactus nozzles
- Inspected raw materials, mill certificates, dimensions, markings and traceability.
- Witnessed chemical-composition and mechanical-property testing.
- Reviewed ITPs, WPS/PQRs, welder and NDT qualifications.
- Supervised welding and VT, reviewed RT films, witnessed UT/PT and MT, and witnessed heat treatment and reviewed reports.
- Performed fit-up, welding and dimensional inspection of heads, channels, tube sheets and bundles.
- Witnessed hydrostatic and air-pressure testing and inspected lining, refractory, blasting, painting, packing and ship loading.
NOV 2016 – MAY 2017
Heineken Jiashan Beer Production Line - Phase 2.1 Project
Vendor: Ningbo Lehui Food Machinery Co., Ltd
Product: Beer fermentation tanks
- Identified carbon-steel and stainless-steel welding and raw materials.
- Reviewed construction documents, ITPs, WPSs, welder and NDT qualifications and welding, hydro, air-sealing and insulation procedures.
- Witnessed hydro, air-sealing, pickling and passivation, polishing and PT tests and reviewed RT films.
- Inspected insulation, visual condition, dimensions, paint appearance and film thickness.
- Reviewed and signed quality documents.
OCT 2016 – NOV 2016
Lars Rail Locomotive Project
Vendor: Jiangsu Railteco Industrial Co., Ltd
Product: Train bogie
Standards: BS EN 15085
Position: Mechanic inspector
- Inspected raw materials, certificates, dimensions, markings and traceability.
- Reviewed fabrication procedures, ITPs, WPSs, welder and NDT qualifications.
- Checked weld root gaps and frame dimensions and levelness against drawings.
- Performed internal weld visual inspection using an endoscope and inspected fillet and butt welds before, during and after welding.
JUN 2016 – SEP 2016
Client: CNOOC
Huang Yan TEG Dehydration Skids and TEG Regeneration Skids
Vendor: Zhuhai Jutal Offshore Oil Services Limited
Product: Modules/Skids
Position: Module/Skid inspector
- Identified carbon-steel, stainless-steel and duplex-steel pipe materials and welding materials.
- Reviewed ITPs, WPSs, welder and NDT qualifications and welding, hydro, PWHT and insulation procedures.
- Supervised pipe-spool fabrication and welding and reviewed RT films.
- Witnessed hydro-testing and pipe-spool flushing.
- Inspected pickling and passivation and pipe and vessel insulation.
- Closed NCRs and punch lists and reviewed and signed quality documents.
MAR 2015 – APR 2015
Client: Alstom
Stainless Steel Train Body for Alstom
Vendor: CRRC Chongqing Branch company
Product: Stainless steel train body
Position: Mechanic inspector
- Identified raw and welding materials and reviewed ITPs, WPSs, welder and NDT qualifications.
- Witnessed TIG welding of stainless steel and supervised workshop cleanliness to avoid ferric contamination.
- Performed structural dimensional inspection against drawings.
- Witnessed pickling and passivation.
- Reviewed and signed inspection reports and issued weekly reports.
AUG 2014 – JAN 2015
Dongguan Humen port Crane Inspection
Vendor: Shanghai Zhenhua Port Machinery Company (ZPMC)
Product: Port cranes
Position: Crane inspector
- Inspected raw materials, certificates, dimensions, markings and traceability.
- Reviewed quality plans, WPSs, welder and NDT qualifications and welding, NDT, dimensional-control and tightness-test procedures.
- Witnessed specimen preparation and tensile, bend, CVN impact and hardness testing.
- Witnessed steel-structure welding procedure qualification and inspected weld appearance, weld size, dimensions, levelness, camber and bending.
- Witnessed NDT and reviewed reports and inspected blasting, painting, packing and loading.
- Reviewed and signed inspection reports and issued daily and weekly reports.
DEC 2013 – MAR 2014
Client: Alstom
Metal Parts of Train for Alstom
Vendor: Changzhou KTK Group
Product: Metal parts of train
Position: Mechanic inspector
- Performed scheduled inspection of metal train parts and recorded results.
- Reviewed documents and performed dimensional, welding-quality and visual inspection.
- Inspected paint appearance, film thickness and gloss.
- Witnessed flush testing of watertight parts and recorded data.
- Tracked NCR parts through complete closure.
AUG 2013 – NOV 2013
Client: CNOOC
Offshore Platform Crane for CNOOC
Vendor: CSSC Wuzhou Crane Works
Product: Offshore platform crane
Position: Steel structure inspector
- Inspected raw materials, mill certificates, dimensions, markings and traceability.
- Witnessed tensile, impact, chemical and hardness testing and reviewed ITPs, WPS/PQRs.
- Witnessed weld fit-up and PWHT and performed MT, RT, UT and PT inspection.
- Inspected blasting, painting, film thickness and adhesive testing.
- Supervised crane assembly and dimensional inspection.
- Witnessed hydraulic-hose and cooling-unit pressure tests, electrical-component function tests and crane proof-load, overload, running and safety-device tests.
- Reviewed and signed the quality dossier.
JUN 2013 – AUG 2013
KING Abdullah Financial Plaza Project
Vendor: Shaoxing Jinggong Steel Building Group
Product: Building steel structures
Position: Steel structure inspector
- Inspected raw materials, certificates, dimensions, markings and traceability.
- Reviewed ITPs, WPS/PQRs, welder and NDT qualifications and instrument calibration certificates.
- Witnessed specimen preparation, tensile, impact and chemical testing, weld fit-up, MT, UT, PT and PWHT.
- Inspected surface preparation and painting, including surface-profile measurement.
- Recorded inspection results and project status, issued weekly reports and performed ship-loading inspection.
APR 2013 – JUN 2013
Client: CNPC
CARMON CREEK Rig Project Team for CNPC
Vendor: Shanxi Xinlong Petroleum Equipment Co., LTD.
Product: Rig steel structure and mud tanks
Position: Inspection engineer
- Inspected raw materials, certificates, dimensions, markings and traceability.
- Reviewed and approved quality plans, WPS/PQRs, welder and NDT qualifications and welding, NDT, dimensional-control, hydro-test and weight-control procedures.
- Witnessed tensile, bend, CVN impact and hardness testing and steel-structure and piping welding procedure qualification.
- Witnessed NDT and reviewed reports, pad-eye load testing and packing.
- Inspected blasting and painting, supervised packing and truck loading and reviewed and signed inspection records.
57000/82000 DWT cargo ship
PSV and FPSO offshore projects
Languages
- English (Professional speaking, reading, writing, listening)
- Chinese (Native language)
Skills
- QA/QC Inspection
- Vendor Surveillance
- Expediting
- Pressure Vessel Inspection
- Piping Inspection
- Valve Inspection
- Welding Inspection
- Steel Structure Inspection
- Railway Equipment Inspection
- NDT Inspection
- Material Traceability
- Quality Document Review
- Production Coordination
- Client and Vendor Coordination
- Painting and Surface Treatment Inspection
Commodities
- Pressure Vessels
- Pipes
- Pipe Fittings
- Valves
- Steel Structures
- Port Cranes
- Ship Hulls
- Skids
- Modules
- Train and Railway Equipment
- Pipe Spools
- Heat Exchangers
- Safety Valves
- Composite Piping
- Subsea Connectors and Clamps
- Castings
- Railway Bogies
- Beer Fermentation Tanks
- Chillers
- Gas Coolers
- Rig Steel Structures
- Mud Tanks